Aker Kvaerner wins Baytown Cogeneration power plant contract with ExxonMobil

abarrelfullabarrelfull wrote on 04 Jun 2012 07:49
Tags:

Latest News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/limit\/10\/t\/My+Blog","limit":"4","module_body":"* %%linked_title%%"}}
  • Want a weekly review of refining news?

2 Apr 2003

Aker Kvaerner has been awarded a lump sum detailed engineering, procurement and construction (EPC) contract from ExxonMobil for the 160 MW natural gas-fired turbine generator and heat recovery steam boiler in Baytown, Texas.

The contract will be executed by Kvaerner Industrial Constructors (KIC) a division of Aker Kvaerner in Houston, Texas. Detailed design and major procurement items will begin immediately and construction in mid-summer 2003. Mechanical completion is scheduled for
late 2004.

Jon Erik Reinhardsen, Executive Group Vice-President of Aker Kvaerner stated, "We are very excited to have received this contract with ExxonMobil and look forward to our collaborative efforts with them."


Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License