All Large Equipments Installed in Sinochem Quanzhou Petrochemical Co., Ltd.

abarrelfullabarrelfull wrote on 22 Dec 2013 08:05
Tags:

Latest News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/limit\/10\/t\/My+Blog","limit":"4","module_body":"* %%linked_title%%"}}
  • Want a weekly review of refining news?

2013-08-29

On August 15, the last piece of large equipment, a debutanizer weighing 300 tons in oil refining project with the capacity of 12 million tons/year in Sinochem Quanzhou Petrochemical Co., Ltd. (Sinochem Quanzhou Petrochemical for short) of Sinochem Group, was successfully hoisted for installation. By then, 142 pieces of large equipments, totally weighing 28,000 tons, were all installed. Recently, on-site construction of the project has entered to piping construction stage. The project is under smooth progress on general.

As a complicated and systematic project, the hoisting assembly of large equipments concerns various areas and with extremely high risks. Sinochem Quanzhou Petrochemical had formulated strict management regulations, review and approval procedures for the assembly in advance. The completion of hoisting assembly and construction of large equipments in this project has set several records in the industry, reaching a high level among the same type of projects in China.


Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License