abarrelfull wrote on 03 Jul 2012 13:48
Tags:
Latest News
{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/limit\/10\/t\/My+Blog","limit":"4","module_body":"* %%linked_title%%"}}
- Want a weekly review of refining news?
May 6, 2003
Anadarko Petroleum Corporation (NYSE:APC) announced today the installation and commissioning of a new permanent production facility at Al Rayyan oil field, offshore Qatar. Anadarko(a) is the operator of this field with a 92.5 percent interest in an exploration/production sharing agreement with the Government of Qatar.
The Al Morjan platform was constructed in Dubai and Sharjah in the United Arab Emirates by Maritime Industrial Services Co. Ltd. The construction took 15 months and included the refurbishment of a 6-leg jack-up rig, fabrication and installation of new topsides, processing facilities and living quarters for 50 personnel.
"Less than just one year since our entry in the Middle East as an operator, we're pleased to have completed what is believed to be the largest jack-up permanent production facility ever built in the Gulf region," said Bill Sullivan, Anadarko Executive Vice President, Exploration and Production. "We plan to expand our presence in the area and are currently exploring high potential acreage in south Al Rayyan, and in two other offshore blocks in Qatar."
On March 12, the completed platform was towed to the Al Rayyan field and installed at its new location in Block 12. The new platform has the capacity to process up to 45,000 barrels of oil per day and will allow Anadarko to significantly increase production from Al Rayyan field. The company is planning to drill exploration and development wells in the block later this year, pending approval by Qatar Petroleum.
Al Morjan replaces the Amina platform, which was installed as a temporary early production facility. In addition to the Al Morjan platform, the field has a permanently moored tanker, Pacific Jewel, with a capacity of 1.3 million barrels that functions as a storage and offloading facility.
Earlier today, His Excellency Abdullah Bin Hamad Al-Attiyah, Minister of Energy and Industry, and several guests from Qatar Petroleum visited Al Morjan platform to inspect the new facilities.
"Our congratulations go to Anadarko on the job they have done in this short period. We are hopeful that this accomplishment is the first of many achievements Anadarko is set to carry out in its partnership with Qatar Petroleum," said H.E. Abdullah Bin Hamad Al-Attiyah, Minister of Energy and Industry, Chairman of Qatar Petroleum.
Anadarko is also active in two exploration blocks offshore Qatar. The company operates Block 13 with a 92.5 percent interest and Anadarko has a 49 percent interest in Block 11. During 2003, Anadarko plans to acquire new seismic data in Block 13.
Anadarko acquired its position in Qatar through the acquisition of Gulfstream Resources Canada Limited in 2001. In June 2002, Anadarko purchased BP's 27.5 percent interest in Blocks 12 and 13 and assumed operatorship on June 6, 2002. Preussag Energie holds the remaining 7.5 percent in Al Rayyan.