APG Treatment Unit Start-up on Priobskoye Oil Field

abarrelfullabarrelfull wrote on 10 Feb 2013 12:32
Tags:

Latest News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/limit\/10\/t\/My+Blog","limit":"4","module_body":"* %%linked_title%%"}}
  • Want a weekly review of refining news?

14.09.2012

Start-up of the second complex was completed in APG Treatment unit on Priobskoye oil field – OOO RN Yuganskneftegaz on September 10, 2012. The project start-up was effected by RusGazEngineering Group of Companies’ installation and start-up department.

The unit was adjusted to stable operating practice with manufacture of the product required in conformity with the design performance.

The project’s scope of works conducted by CJSC RusGazEngineering Group of Companies comprised APG treatment unit design, key process equipment manufacturing and delivery, PCS, erection supervision and commissioning.


Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License