Axis Well Technology - Contract award from ONGC-V India

abarrelfullabarrelfull wrote on 14 Feb 2013 14:27
Tags:

Latest News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/limit\/10\/t\/My+Blog","limit":"4","module_body":"* %%linked_title%%"}}
  • Want a weekly review of refining news?

01/07/2010

Axis was awarded a contract for the well engineering and production technology work as input to the overall master field development plan for the Farzad "B" field in the Persian Gulf (offshore Iran). Director Jim Anderson said he was delighted that Axis secured this work in a tender / bid situation. A dedicated study team was assembled to deliver this project which included, well engineers, completion engineers, petroleum engineers, well test engineer, metallurgist, Geo-mechanical specialist and a project manager. This study was carried out over a 4 month period and was delivered on time and on budget. This was a challenging and high profile project with harsh well conditions.


Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License