CNOOC Ltd. Announces the Production from BZ28-2S

abarrelfullabarrelfull wrote on 17 Jul 2014 12:39
Tags:

Latest News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/limit\/10\/t\/My+Blog","limit":"4","module_body":"* %%linked_title%%"}}
  • Want a weekly review of refining news?

March 19, 2009

CNOOC Limited announced today that its Bozhong (BZ) 28-2S oil field successfully commenced production with 4000 barrels of oil per day via 4 wells.

BZ 28-2S, located in the south of Bohai Bay with a water depth of 21 meters, is the largest field among all the oil projects expected to come on stream this year offshore China.

BZ 28-2S, together with BZ29-4, BZ28-2SN and BZ34-1N, is subject to joint development to maximize the commercial value. These oil fields, adjacent to each other, are collectively named as BZ28-2S oil fields, of which BZ28-2S is the first to start production.

The production is expected to ramp up an average 25,000 barrels of oil per day by 2011.

The main development facilities include one central platform, 49 wells and one FPSO. By sharing facilities, BZ28-2S and other fields will be developed in a more effective way.

According to the Company's 2009 plan, there will be five new projects coming on stream in Bohai Bay. The early start-up of BZ28-2S will serve to accelerate the development of the other four projects.

BZ28-2S is an independent field of CNOOC Ltd which was discovered in 2006.

NOTE: On March 18, 2009, with the Bozhong 28-2 South CEP platform in operation, marked the Bozhong 28-2 South project constructed by COOEC (stock code: 600583) successfully completed ahead of schedule.


Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License