Completion of Trans-Austria-Gas pipeline TAG Loop II

abarrelfullabarrelfull wrote on 23 Dec 2014 12:04
Tags:


January 2007

The 380 km TAG Loop II pipeline system, which has started operation on January 1, 2007, is intended to supply the Austrian gas market and to serve mainly as transit line to Italy. The pipeline system runs from the Slovakian/Austrian border near Baumgarten an der March to Arnoldstein on the Austrian/Italian border. The construction of the pipeline posed special challenges, such as the crossing of the Sulm Valley with slopes up to 70 % over a length of 1.7 km.

ILF as engineering partner of Snamprogetti was in charge of the complete conceptual design and authority engineering, as well as jointly responsible for tender design and construction supervision.


Related News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/tag\/pipeline\/category\/blog\/limit\/10\/t\/My+Blog","limit":"3","module_body":"* %%linked_title%%"}}

Looking for information on the Pipeline sector?


Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License