“Giprogazoochistka” OJSC completes preparation of detail documentation for Kirishi Hydrocracking Complex

abarrelfullabarrelfull wrote on 21 Oct 2013 08:01
Tags:

Latest News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/limit\/10\/t\/My+Blog","limit":"4","module_body":"* %%linked_title%%"}}
  • Want a weekly review of refining news?

17.06.2009

On June 8 “Giprogazoochistka” and CB&I Lummus signed a supplement agreement to the design contract with respect to design documentation required for commissioning of Oil Deep Processing Complex based on fuel oil hydrocracking of “KINEF” LLC.

Kirishi Hydrocracking Complex – is one the most large-scaled projects in the contemporary history which will become the biggest in the Europe upon construction completion. The Complex will allow increasing oil products capacity up to 24-25 MM t . Oil processing depth will grow from 54% to 85%.

“Giprogazoochistka” OJSC carries out works on designing, support of equipment delivery (including non-standardized equipment), designer construction supervision of amine regeneration unit and sulfur recovery unit within the Complex.

Total complex of works to prepare detail design documentation has been carried out by the company specialists as long ago as 2008. Supplement agreement for scope of work increase was signed on the initiative of the customer – Dutch company CB&I Lummus, which is ABB Lummus Global legal successor at the beginning of June


Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License