Hai Yang Shi You 118 Sets Sail

abarrelfullabarrelfull wrote on 12 Dec 2014 14:19
Tags:

Latest News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/limit\/10\/t\/My+Blog","limit":"4","module_body":"* %%linked_title%%"}}
  • Want a weekly review of refining news?

2014-8-23

On August 23th, "Hai Yang Shi You 118", built for China National Offshore Oil Corporation (CNOOC) depart off the port #17 from DSIC Offshore. A brand new milestone just being marked by this significant moment. DSIC Offshore is in charge of topside module construction and completed the whole work 20 days ahead of the delivery deadline. The highest level in 150,000 tons FPSO construction field has just been reached.

The topside module of a FPSO is the most important part for the whole project construction.

The contract of FPSO-6 is a turnkey contract, which main hull was built by DSIC group company and the topside module was constructed by DSIC Offshore.

Despite the difficulty of complicated interface coordination, the limited resources is a critical issue for the planned construction schedule. Every construction field, cranes and transportation resources are provided by the group company.

With the coordination of every level through the company, one month in advance for the mechanical completion.


Related News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/tag\/engineering\/category\/blog\/limit\/10\/t\/My+Blog","limit":"3","module_body":"* %%linked_title%%"}}

Looking for information on the Engineering sector?


Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License