Installation of GLP at SALMAN field

abarrelfullabarrelfull wrote on 25 Jun 2015 08:54
Tags:

Latest News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/limit\/10\/t\/My+Blog","limit":"4","module_body":"* %%linked_title%%"}}
  • Want a weekly review of refining news?

13 Mar 2008

The last topside platform of SALMAN Offshore field with 3500 Tons weight installed by float over method on March.12.2008. The module designed as Gas lifting platform (GLP) is the 7th installation by Deep Offshore Technology (D.O.T.) in the field during last 2 years.


Related News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/tag\/services\/category\/blog\/limit\/10\/t\/My+Blog","limit":"3","module_body":"* %%linked_title%%"}}

Looking for information on the E&P sector?


Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License