Mexico, July 14th, 2004

Last 5th of July concluded successfully the installation works of the accommodation module IPC 39 in Cantarell field for the Company PEMEX Exploration and Production.

The platform consists of Jacket or substructure, piles, interconnection bridge, deck, accommodation module with capacity for 75 beds and heliport.

The Project has been entirely executed under a “turn key” Contract, including basic engineering, detailed engineering and construction engineering, material and equipment purchasing, construction and transport of the structures above mentioned to Cantarell Field.

Construction works have been carried out in Tuxpan (Veracruz) and in a few weeks will be achieved the installation of the interconnection bridge and connection and functional testing of the platform.