Mechnical Hand-over of A 2.0 MM TPY Residue Oil Hydrotreating Unit

abarrelfullabarrelfull wrote on 03 Apr 2020 13:37
Tags:

Latest News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/limit\/10\/t\/My+Blog","limit":"4","module_body":"* %%linked_title%%"}}
  • Want a weekly review of refining news?

May 15, 2017

The 2.0 MM TPY residue oil hydrotreating unit designed by Luoyang Petrochemical Engineering Corporation (LPEC) for SINOPEC Jinling Petrochemical Company was successfully mechanically handed over to the client. Mr. Han Weiguo, the vice president of LPEC, the project manager as well as project team people attended the mechanical hand-over ceremony. The 1.5 MM TPY continuous catalytic reformer and aromatic extraction complex designed by LPEC is still in construction as scheduled.


Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License