Mustang Engineering Awarded Detailed Design for Mirage Topsides

abarrelfullabarrelfull wrote on 08 Aug 2012 10:31
Tags:


10/16/2007

Mustang Engineering (“Mustang”), a subsidiary of international energy services company John Wood Group PLC (“Wood Group”), has been awarded a contract by ATP Oil & Gas Corporation to provide detailed engineering and procurement support for the topsides production facilities on ATP’s first newbuild deepwater facility, the Telemark Hub floating drilling/production facility, also known as Mirage.

The facility will be located in 4,000 feet of water at Block MC-941, offshore Louisiana, Gulf of Mexico. Designed for 25,000 BPD oil and 50MMscf/D gas, the unit will have expansion capability to 100MMscf/D gas. It will incorporate six dry-tree wellheads with three pairs of future subsea flow lines. Mirage is being designed as a light-weight, cost-effective deepwater facility supporting full drilling aboard the floating offshore installation. The detailed design is expected to be completed by January 2008, with installation planned for later in 2008.


Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License