New project for AXION Energy in Argentina

abarrelfullabarrelfull wrote on 31 Mar 2020 08:17
Tags:

Latest News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/limit\/10\/t\/My+Blog","limit":"4","module_body":"* %%linked_title%%"}}
  • Want a weekly review of refining news?

September 21, 2017

In July, AXION Energy signed a contract with Techint E&C to expand the Catalytic Cracking Unit (FCCU) in its Campana’s Refinery, in the province of Buenos Aires.

The objective of the project is to increase the capacity of heavy diesel processing of the FCCU, from 28 KBPD to 31 KBPD. To do this, some parts of the Unit will have to be replaced (such as the towers, heat exchangers and pumps), as well as the piping and instrumentation. In addition, the existing structures shall be checked and, eventually, modified.

Techint will have to develop the Detail Engineering in six months for Axion to be able to deal with the purchase of equipment and move forward with the modifications and installation works, which should be concluded by September 2018, when the plant is expected to shut down.


Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License