Perisai Kamelia Installed In July

abarrelfullabarrelfull wrote on 10 Dec 2013 14:23
Tags:


July 2013

The Perisai Kamelia underwent final testing and commissioning in Keppel Shipyard and met the extremely short schedule requirements. The vessel left the conversion yard in July and was installed on the Kamelia Field in the 3rd week of July. The mooring and riser hook-up is was also completed in July. LMC designed the external cantilever turret, which will be used to maintain the vessel location offshore during potential tropical cyclone conditions.