Start-up Meeting for Overall Plant Design of SINO-Kuwait Guangdong Integrated Refinery & Petrochemical JV Project

abarrelfullabarrelfull wrote on 03 Apr 2020 16:11
Tags:

Latest News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/limit\/10\/t\/My+Blog","limit":"4","module_body":"* %%linked_title%%"}}
  • Want a weekly review of refining news?

On July 19, 2016, a start-up meeting for SINO-Kuwait Guangdong Integrated Refinery & Petrochemical JV Project was held in Zhanjiang, Guangdong Province, China. The meeting was chaired by Mr. Yu Xizhi, the director of the project. Mr. Zhu Huaxin, the chief engineer and vice president of LPEC and LPEC's project team attended the meeting.

In this project, LPEC is the contractor for the preparation of feasibility study, overall plant design and engineering design of the project. The project is scheduled to be completed within 3 years.


Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License