Successful testing of the Chim Sao North appraisal well

abarrelfullabarrelfull wrote on 14 May 2013 11:49
Tags:

Latest News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/limit\/10\/t\/My+Blog","limit":"4","module_body":"* %%linked_title%%"}}
  • Want a weekly review of refining news?

21 May 2008

Santos today announced the successful completion of drilling and testing of the Chim Sao North appraisal well (12W-CS-2X) on Block 12W in Vietnam.

The target Middle Dua sand sequence was encountered as expected. Following successful coring of the reservoir and wireline logging operations, two reservoir zones were drill stem tested.

The first zone tested flowed oil at a sustained rate of 1650 barrels of oil per day ("bopd") plus 1.4 million standard cubic feet of gas per day ("MMscfd") on a 40/64 inch choke. The second zone tested flowed oil at a sustained rate of 2680 bopd plus 2.1 MMscfd on a 48/64 inch choke. No water was produced on either test.

The well will be suspended as a future producer. The rig will now move to carry out the exploration program in Block 12W with the drillilng of the Chim Ung and Chim Cong exploration prospects.

“The positive results from the Chim Sao North appraisal well are encouraging and we are working closely with our partners towards a final investment decision on the Chim Sao development.” Santos’ Acting Chief Executive Officer David Knox said.

“Santos entered Vietnam in 2006 and has made very good progress since with oil discoveries at Chim Sao and Dua,” Mr Knox said.


Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License