The Central Truss of Panyu 30-1 Jacket Joined up

abarrelfullabarrelfull wrote on 17 Jul 2014 08:02
Tags:

Latest News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/limit\/10\/t\/My+Blog","limit":"4","module_body":"* %%linked_title%%"}}
  • Want a weekly review of refining news?

2007-09-05

Following the successful turn-over of Row-2 at COOEC Qingdao Fabrication Yard on August 30, Row-3 was turned over and joined with Row-2 smoothly on September 2 after a five-hour operation. Thus Panyu 30-1 jacket central truss was finally joined up successfully.

The whole lifting operation followed strictly the requirement of unitary command and unitary procedure which ensures the best implementation of the turn-over operation in the final triumph. It symbolizes a monumental realization of the central truss installation of Panyu 30-1 jacket and also brings a satisfactory end to the first large-scale lifting operation at Qingdao Fabrication Yard.


Related News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/tag\/upstream\/category\/blog\/limit\/10\/t\/My+Blog","limit":"3","module_body":"* %%linked_title%%"}}

Looking for information on the E&P sector?


Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License