Tullow Oil plc – First Gas from Munro

abarrelfullabarrelfull wrote on 03 May 2013 06:06
Tags:

Latest News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/limit\/10\/t\/My+Blog","limit":"4","module_body":"* %%linked_title%%"}}
  • Want a weekly review of refining news?

25 Aug 2005

Tullow Oil plc (Tullow) today announces that natural gas production from its Munro field development commenced on 22 August 2005 at an initial average rate of 55 mmscfd. This has been achieved six weeks ahead of the development schedule and only 16 months after the field was discovered.

The Munro development, Tullow’s second UK development in 2005, consists of a single well, a minimum-facilities platform and a 5km pipeline that connects to the Tullow-owned CMS III and CMS infrastructure. The Munro field, in which Tullow has a 15% interest, is expected to produce at a peak rate of 80 mmscfd.


Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License