Wenchang 19-1A Jacket Was Smoothly Dragged and Loaded Aboard

abarrelfullabarrelfull wrote on 29 Aug 2014 10:30
Tags:

Latest News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/limit\/10\/t\/My+Blog","limit":"4","module_body":"* %%linked_title%%"}}
  • Want a weekly review of refining news?

2007-06-22

On June 21st, Wenchang 19-1A jacket was smoothly dragged in position to Offshore Oil 221 Barge after it was constructed on land. The successful loading of the jacket unveiled the curtain of offshore installation of Wenchang Engineering Project.


Related News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/tag\/engineering\/category\/blog\/limit\/10\/t\/My+Blog","limit":"3","module_body":"* %%linked_title%%"}}

Looking for information on the Engineering sector?


Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License