New well commissioned at Oil Rocks field

abarrelfullabarrelfull wrote on 22 Jan 2012 17:55
Tags: azerbaijan c-asia socar upstream

Latest News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/limit\/10\/t\/My+Blog","limit":"3","module_body":"* %%linked_title%%"}}
  • Want a weekly review of refining news?

The well #2288 drilled from the platform #1887 at Oil Rocks field has recently been commissioned.

The well has been drilled to Girmaki Suite by Bayil Limany Offshore Exploration Drilling Office of Complex Drilling Works Trust. The daily production of the well makes 42 tons of oil from 2998-2989 meters depth. It will be commissioned by Oil Rocks OGPD. Drilling of 40 wells is considered from the platform #1887. Up to now 33 wells have been drilled and commissioned.


Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License