Transeuro Energy Ukraine Operations Update

abarrelfullabarrelfull wrote on 27 Mar 2012 05:41
Tags: shale transeuro ukraine upstream

Latest News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/limit\/10\/t\/My+Blog","limit":"3","module_body":"* %%linked_title%%"}}
  • Want a weekly review of refining news?

Transeuro Energy Corp. ("Transeuro" or the "Company") announces that in Ukraine the rig operations have so far removed the 3 temporary bridge plugs that were used to suspend the well in May last year and cleaned out the wellbore back to the original TD of 3505m. Preparations are ongoing to install the 8 packers and 5 'FracPorts' across the C12, C13, C14, C15 and C16 intervals from 3100 meters — 3500 meters in depth. Rig operations are expected to take another 1 to 2 weeks and the rig will then be dismantled and moved from the site to make space for the Schlumberger fracturing pumps and associated equipment.

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License