OJSC "AK" Transneft "has begun to fill the oil the second stage of ESPO oil pipeline

abarrelfullabarrelfull wrote on 03 Jul 2012 06:54
Tags: c-asia pipeline russia transneft

Latest News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/limit\/10\/t\/My+Blog","limit":"3","module_body":"* %%linked_title%%"}}
  • Want a weekly review of refining news?

OJSC "AK" Transneft "began work on completing the second stage of the oil pipeline" Eastern Siberia - Pacific Ocean ". Oil entered into a linear part of the pipeline at the start of the cell treatment and diagnosis of NPC-21, located near the town of Skovorodino Amur region.

In the period from 2 to 7 July will be filled with oil 197 km oil pipeline, which had previously been carried out hydraulic tests and in-line inspection. After completion of the pipeline technological break will continue. Commissioning of the second stage of the ESPO is scheduled for late 2012.


Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License