SMM Wins Contract for erection of 3 cryogenic LNG tanks

abarrelfullabarrelfull wrote on 05 Jul 2012 16:43
Tags: engineering europe france lng smm

Latest News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/limit\/10\/t\/My+Blog","limit":"3","module_body":"* %%linked_title%%"}}
  • Want a weekly review of refining news?

SMM signed on 08.06.2012, with Entrepose Projects, a 30M€ contract, for the metalomechanical erection of 3 cryogenic tanks of 190.000 m3 each, for liquid natural gas storage, in what will be the largest European natural gas terminal ─ Dunkerque, France.

This award reinforces the recognized SMM erection capacity in the international market, namely in the LNG area, and reinforces the success of Portuguese companies in the production of tradable services.

The works will be mostly performed by skilled and experienced Portuguese manpower.

The project will be developed until the end of 2014, involving a maximum of 200 workers.


Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License