ATP Announces Completion of MC 941 A-2 Telemark Well

abarrelfullabarrelfull wrote on 11 Jul 2012 05:52
Tags: atp gofm n-america upstream usa

Latest News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/limit\/10\/t\/My+Blog","limit":"3","module_body":"* %%linked_title%%"}}
  • Want a weekly review of refining news?

ATP Oil & Gas Corporation (NASDAQ: ATPG) today announced the completion of the workover at its Mississippi Canyon (“MC”) Block 941 A-2 well located in the Mirage Field at the Telemark Hub. The well was completed with 3 ½ inch tubing at a measured depth of 17,140 to 17,401 feet to add the Miocene B Sand completion to the wellbore for field development optimization. Initial test flow rates are at 4,000 barrels equivalent per day (Boe/d) of which 90% is oil. The A-2 well will be tied back to the facility immediately and is expected to produce at a rate of 4,000 to 5,000 Boe/d.

The MC 941 A-2 well produces through the ATP Titan floating drilling and production platform. ATP operates the ATP Titan and Telemark Hub which is in approximately 4,000 feet of water with a 100% working interest and holds a 100% ownership in ATP Titan LLC which owns the ATP Titan and associated pipelines and infrastructure.


Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License