Absheron Drilling Works Office drills new wells

abarrelfullabarrelfull wrote on 27 Sep 2012 07:07
Tags: azerbaijan c-asia socar upstream

Latest News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/limit\/10\/t\/My+Blog","limit":"3","module_body":"* %%linked_title%%"}}
  • Want a weekly review of refining news?

Absheron Drilling Works Office of Complex Drilling Works Trust has started drilling the well # 1647 on Amirkhanly field.

The projected depth of the well drilled to Maykop Suite makes 800 metres. Besides, the Office launched drilling the well # 1081 on offshore Pirallahy island field. The projected depth of the well drilled to Girmaki Suite makes 700 metres.

According to the geologists, the expected output will total 4 tons of oil per day.


Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License