Angarsk Petrochemical Company launches Gasoline Blending Unit

abarrelfullabarrelfull wrote on 27 Dec 2012 13:57
Tags: c-asia refinery rosneft russia

Latest News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/limit\/10\/t\/My+Blog","limit":"3","module_body":"* %%linked_title%%"}}
  • Want a weekly review of refining news?

Angarsk Petrochemical Company has commissioned a gasoline blending unit with an annual output capacity of 2.3 million tonnes. The commissioning is an important step in the delivery of a large-scale investment program Rosneft is implementing at the plant. The program aims to ensure that all of the plant’s output meets Euro-4 and Euro-5 standards.

Modern gasoline production is a complicated process of blending various components and the final product has to meet multiple requirements. With the launch of the new unit the blending of gasoline components and octane booster additives becomes fully automated. New technologies make it possible to use blend stocks with maximum efficiency to produce high-quality high-grade gasoline. The linear programming system ensures constant control over the disposition and the throughput of components and the quality of the final product.

The Angarsk Petrochemical Company's gasoline blending unit is a major production facility comprising an upgraded pump station with a control board, a tank farm and a fire water station. A cable rack and a process pipeline rack have been built. The station’s tanks are fitted with sophisticated equipment preventing oil products leaking into the atmosphere and ensuring their accident-free operation.

Background:

Angarsk Petrochemical Company is a subsidiary of Rosneft. In 2011, the company refined over 9.8 million tonnes of crude. The figure for 2012 is expected to exceed 10 million tonnes. The output of Euro-3 gasoline of various grades will surpass 850,000 tonnes.

Since 2010 as part of the investment program Angarsk Petrochemical Company has commissioned an isomerization unit, completed a hydrogen plant and put on-stream a sulfuric acid production unit. The program provides for the construction of such major facilities as a diesel fuel hydrotreater and a sulfuric acid alkylation complex, a catalytic cracking gasoline hydrodesulfurization unit and a methyl tert-butyl ether unit. A lubricants production development program is to be implemented before 2017.


Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License