Dunkirk LNG TANKS

abarrelfullabarrelfull wrote on 13 Mar 2013 07:06
Tags: edf engineering europe france lng smm

Latest News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/limit\/10\/t\/My+Blog","limit":"3","module_body":"* %%linked_title%%"}}
  • Want a weekly review of refining news?

Another important milestone at Dunkirk site (construction of three LNG tanks): Conclusion of prefabrication of roof tanks for 3 sectors. This task started on September 2012 and was Concluded at the end of February, the originally scheduled.

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License