Foster Wheeler Signs Technical Services Agreement with OJSC Khabarovsk Oil Processing Refinery in Russia

abarrelfullabarrelfull wrote on 19 Sep 2013 06:23
Tags: c-asia engineering foster-wheeler refinery russia

Latest News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/limit\/10\/t\/My+Blog","limit":"3","module_body":"* %%linked_title%%"}}
  • Want a weekly review of refining news?

Foster Wheeler AG (Nasdaq:FWLT) announced today that a subsidiary of its Global Engineering and Construction Group has signed a technical services agreement with OJSC Khabarovsk Oil Processing Refinery to provide construction management services for the hydroprocessing project at the refinery in Russia’s Far East.

The terms of the agreement were not disclosed and bookings will be recorded as work is released by OJSC.

The objective of the project is to produce more higher-value, lighter products. The complex includes a hydrocracker, hydrotreater, hydrogen unit, amine regeneration unit, sour water stripper, sulfur recovery unit, vapor recovery unit, waste water treatment unit, ground flare, tank farm and pump houses. The hydrogen plant is based on Foster Wheeler’s proprietary Terrace WallTM steam methane reforming technology.

“Foster Wheeler has been working at this refinery for ten years,” said Umberto della Sala, President and Chief Operating Officer of Foster Wheeler AG. “We executed the front-end engineering design for the entire hydroprocessing complex, basic design for the hydrogen production facility, design and supply of the steam reformers for the hydrogen plant, and have been providing on-going project management consultancy services as the project progressed into the engineering, procurement and construction phases. We are very pleased to extend our role on this project, which is now in the construction phase.”


Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License