Rig secured for Yolla gas field drilling program

abarrelfullabarrelfull wrote on 01 Apr 2014 08:12
Tags: australia origin seadrill services

Latest News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/limit\/10\/t\/My+Blog","limit":"3","module_body":"* %%linked_title%%"}}
  • Want a weekly review of refining news?

Origin Energy Limited (Origin), as operator of the BassGas Joint Venture, today announced that Seadrill Australia Pte Ltd (Seadrill) has been contracted to provide the drilling rig for the project's upcoming work program in Bass Strait's Yolla gas field.

The West Telesto drilling rig is expected to be mobilised during the 2014/15 Australian summer to drill the Yolla-5 and Yolla-6 wells as part of the Yolla Mid Life Enhancement project's second stage. The West Telesto is a three-leg jack-up rig that will cantilever over the Yolla platform during the drilling campaign.

The drilling of Yolla-5 and Yolla-6, along with the installation of associated flow lines and other works, will support the maintenance of gas production from the Yolla field.


Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License