Technip awarded a frame agreement by Statoil in Brazil

abarrelfullabarrelfull wrote on 12 May 2011 12:28
Tags: brazil services statoil technip

Latest News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/limit\/10\/t\/My+Blog","limit":"3","module_body":"* %%linked_title%%"}}
  • Want a weekly review of refining news?

After a competitive tender process, Technip has been awarded by Statoil Brasil Óleo & Gàs Ltda. a frame agreement for engineering studies. The scope of this 3-year contract covers feasibility, concept and front-end engineering design studies for Statoil’s existing offshore production fields and future developments in Brazil.

All work will be performed by Technip’s operating center in Rio de Janeiro, Brazil with support from the Group’s European centers, and will achieve a minimum 60% of local content.

This award reinforces Technip’s leading position as engineering services supplier to the Brazilian market where the Group previously carried out similar feasibility, conceptual and front-end engineering design projects for Petrobras, OGX, OSX and Maersk.


Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License