Included page "clone:killajoules" does not exist (create it now)

BP awarded 10% interest in Abu Dhabi’s ADCO onshore concession
BP today signed an agreement with the Supreme Petroleum Council of the Emirate of Abu Dhabi and the Abu Dhabi National Oil Company (ADNOC) that grants BP a 10% interest in Abu Dhabi’s ADCO onshore oil concession, which has a life of 40 years.

date.png01 Jan 2017 11:40 | comments.png 0 Comments | tags.png bp m-east uae upstream [ More ]

Rumaila oilfield achieves 3 billion barrel production landmark
The Rumaila Operating Organisation (ROO), composed of BP, PetroChina and the South Oil Company of Iraq, today announced that the Rumaila oilfield has produced three billion barrels of oil since the joint venture began operating in January 2010.

date.png01 Jan 2017 11:35 | comments.png 0 Comments | tags.png bp iraq m-east upstream [ More ]

BP and PTT sign LNG sale and purchase agreement
BP and PTT Public Limited Company (PTT) entered into a sales and purchase agreement for liquefied natural gas (LNG).

date.png30 Dec 2016 21:06 | comments.png 0 Comments | tags.png asia bp lng ptt thailand [ More ]

Amec Foster Wheeler awarded new BP contract for Eastern Trough Area Project (ETAP) Additional Living Quarters
Amec Foster Wheeler announces today that it has been awarded an Engineering, Procurement and Construction (EPC) contract by BP for the provision of additional living quarters, as part of BP’s Life Extension Project on the Eastern Trough Area Project (ETAP) in the Central North Sea. The BP ETAP Life Extension Project will extend the life of the platform to 2030 and improve its operating efficiency.

date.png28 Sep 2015 07:16 | comments.png 0 Comments | tags.png amec-foster-wheeler bp engineering europe services uk [ More ]

Angola: Total starts up production from Dalia Phase 1A on deep offshore Block
Total has started production from Dalia Phase 1A, a new development on its deep offshore operated Block 17, located 135 km off the coast of Angola. Dalia Phase 1A will develop additional reserves of 51 million barrels (Mb) and will contribute 30,000 barrels per day (b/d) to the block’s production.

date.png27 Jul 2015 09:02 | comments.png 0 Comments | tags.png africa angola bp exxon statoil top total upstream [ More ]

FMC Technologies Awarded $297 Million Contract for Subsea Production Systems for Shah Deniz Stage 2 Project
FMC Technologies, Inc. (NYSE: FTI) announced today that it has received an order from BP Exploration (Shah Deniz) Ltd. to supply subsea production systems for Well Clusters 3-5 of the Shah Deniz Stage 2 project in the Caspian Sea. The order has an estimated value of $297 million in revenue and is in addition to the initial order for Well Clusters 1-2 received in 2014 from BP, the operator of the Shah Deniz Stage 2 project. The Shah Deniz field is located offshore in the Azerbaijan sector of the Caspian Sea, approximately 100km south of Baku.

date.png01 Jul 2015 12:50 | comments.png 0 Comments | tags.png azerbaijan bp c-asia fmc services [ More ]

Alaska LNG Project LLC Receives Conditional Authorization to Export LNG to Non-Free Trade Agreement Countries
The Alaska LNG project marks another significant milestone with today’s announcement by the United States Department of Energy that it has conditionally authorized the Alaska LNG Project LLC to export liquefied natural gas to non-Free Trade Agreement countries.

date.png09 Jun 2015 13:24 | comments.png 0 Comments | tags.png alaska bp conoco exxon lng n-america transcanada usa [ More ]

Massy Wood Group wins $250 million BP contract in Trinidad & Tobago
Massy Wood Group has been awarded a five year contract, with a potential value of up to $250 million, by BP to provide services to its operations in Trinidad & Tobago.

date.png13 May 2015 09:27 | comments.png 0 Comments | tags.png bp s-america services trinidad-tobago wood-group [ More ]

BP selects Technip for the Thunder Horse South Expansion project in the Gulf of Mexico
Technip was awarded by BP Exploration & Production Inc. a lump sum project for the design, engineering, fabrication, installation and pre-commissioning of the new production pipeline systems on the south side of the Thunder Horse production drilling quarters unit. At a water depth of approximately 1,900 meters, the current field development is located in Mississippi Canyon Blocks 778 and 822, in the ultra-deepwater Gulf of Mexico environment.

date.png13 May 2015 07:10 | comments.png 0 Comments | tags.png bp gofm n-america services technip top usa [ More ]

Alaska LNG Project Draft Resource Reports Filed with FERC
A series of draft environmental and socioeconomic reports for the Alaska LNG Project has been submitted to the Federal Energy Regulatory Commission (FERC), which is responsible for conducting the environmental review of the project. These reports, located at www.ferc.gov, also launch the pre-file public engagement process and provide preliminary baseline data about the project area and its potential impacts.

date.png12 Feb 2015 06:51 | comments.png 0 Comments | tags.png bp exxon lng n-america transcanada usa [ More ]
page 1 of 22123...2122next »
Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License