Included page "clone:killajoules" does not exist (create it now)

Petrobras starts-up FPSO Cidade de Ilhabelha in Santos Basin pre-salt Sapinhoá field
Petrobras announces that the offshore platform Cidade de Ilhabela started-up this Thursday, November 20, at 5:37 a.m., in the Santos Basin pre-salt field of Sapinhoá. The new unit is part of the set of production projects scheduled for this year as outlined in the company’s 2014-2018 Business and Management Plan.

date.png22 Nov 2014 08:24 | comments.png 0 Comments | tags.png brazil fpso petrobras s-america upstream [ More ]

Abreu e Lima Refinery initiates Atmospheric Distillation Unit start-up procedure
Petróleo Brasileiro S.A. - Petrobras began on Wednesday (11/19) the first step to start-up the Abreu e Lima Refinery (Rnest), a company project located in Ipojuca, Pernambuco, by injecting natural gas into the Atmospheric Distillation Unit (UDA).

date.png22 Nov 2014 08:14 | comments.png 0 Comments | tags.png brazil petrobras refinery s-america top [ More ]

Sembcorp Marine Subsidiary Jurong Shipyard Secures Us$696 Million Libra FPSO Conversion Contract
Sembcorp Marine is pleased to announce that its wholly-owned subsidiary Jurong Shipyard Pte Ltd has secured a US$696 million contract to convert a shuttle tanker into a floating, production, storage and offloading (FPSO) vessel for OOGTK Libra GmbH & Co KG, a joint venture between Brazil’s Odebrecht Oil & Gas and Teekay Offshore.

date.png14 Oct 2014 06:11 | comments.png 0 Comments | tags.png brazil engineering fpso petrobras s-america sembcorp [ More ]

Libra consortium signs letter of intent for charter of its 1st FPSO for Extended Well Tests
Petróleo Brasileiro S.A. – Libra Consortium has signed a letter of intent with Odebrecht/Teekay (OOG-Teekay), winner of a tender process, for the charter of a FPSO-type platform (floating production, storage and offloading) designed for the extended well test campaign at the Libra area, in Santos Basin pre-salt.

date.png10 Oct 2014 11:23 | comments.png 0 Comments | tags.png brazil fpso petrobras s-america services [ More ]

GE Oil & Gas Awarded Over $300 Million Subsea Equipment Contract from Petrobras
GE Oil & Gas (NYSE: GE) today announced a more than $300 million contract with Petrobras for the first supply of the subsea manifold systems for Brazil’s pre-salt fields, located offshore in water depths up to 6,500 feet (2,000 meters).

date.png19 Sep 2014 11:42 | comments.png 0 Comments | tags.png brazil ge petrobras s-america services [ More ]

Aker Wayfarer Wins Five-Year Contract from Petrobras
Aker Solutions' subsidiary Aker Oilfield Services (AKOFS) has won a contract worth USD 465 million over five years from Petrobras to provide subsea intervention services offshore Brazil from the Aker Wayfarer vessel.

date.png15 Sep 2014 13:30 | comments.png 0 Comments | tags.png aker brazil petrobras s-america services [ More ]

Drilling Begins on the Libra Field in Brazil
With a target depth of 5,850 meters, the first appraisal well was spudded on Libra field off the coast of Brazil in early August. The super-giant field, located 200 kilometers offshore, has estimated resources of between 8 billion and 12 billion barrels in reservoirs that lie under a thick layer of salt. The well kicks off several years of work that will allow Total and its partners¹ to improve their understanding of the gigantic field.

date.png22 Aug 2014 08:16 | comments.png 0 Comments | tags.png brazil cnooc cnpc petrobras s-america shell top total upstream [ More ]

FMC Technologies Receives Order for Five Additional Subsea Manifolds for Petrobras' Pre-salt Fields
FMC Technologies, Inc. (NYSE: FTI) announced today that it has received an order for five subsea manifolds from Petrobras, Brazil's national oil company, for its pre-salt fields located offshore Brazil. The order represents the balance of the 16 subsea manifolds ordered under a frame agreement in 2013. In total, FMC Technologies has received orders for 19 subsea manifolds for Petrobras' pre-salt fields. Engineered and manufactured in Brazil, the subsea manifolds are scheduled for delivery beginning in 2015.

date.png20 Aug 2014 05:58 | comments.png 0 Comments | tags.png brazil petrobras s-america services [ More ]

FPSO Cidade de Mangaratiba Leaves Port
The Schahin - Modec, which contracted to build and operate the FPSO Cidade De Mangaratiba, began on Saturday (16/8) to the output of the unit BrasFels shipyard in Angra dos Reis. This platform vessel will operate in the area of ​​Iracema Sul, in the Lula field, located in the Pre-Salt Pole of the Santos Basin, off the coast of the State of Rio de Janeiro.

date.png19 Aug 2014 11:27 | comments.png 0 Comments | tags.png brazil fpso modec petrobras s-america services [ More ]

Apollonia well confirms extension of Júpiter discovery in pre-salt Santos basin
Galp Energia, partner of the consortium for the exploration of Block BM-S-24, informs that the preliminary results obtained during the drilling of well 3-BRSA-1246-RJS (3-RJS-732), informally known as Apollonia, have confirmed the presence of hydrocarbons and the extension of the Júpiter discovery in the pre-salt Santos basin.

date.png14 Aug 2014 06:06 | comments.png 0 Comments | tags.png brazil galp petrobras s-america upstream [ More ]
Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License