Included page "clone:killajoules" does not exist (create it now)

ERCB approves Enbridge pipeline application
The Energy Resources Conservation Board (ERCB) has issued Decision 2012 ABERCB 009, which approves Enbridge Inc. applications to construct and operate two pump stations and a pipeline that would transport diluted bitumen from Fort McMurray to Sherwood Park.

date.png31 Aug 2012 20:17 | comments.png 0 Comments | tags.png canada enbridge n-america pipeline [ More ]

Enbridge Energy Partners Restarts Line 14
Enbridge Energy Partners, LP (NYSE:EEP) ("the Partnership") announced today that its Line 14 has been safely restarted.

date.png08 Aug 2012 19:47 | comments.png 0 Comments | tags.png enbridge n-america pipeline [ More ]

NEB approves Enbridge application to reverse Line 9 flow
The National Energy Board (NEB or the Board) announced today its decision to grant the application filed by Enbridge Pipelines Inc. (Enbridge) to reverse the flow on a segment of its Line 9 pipeline, subject to certain conditions.

date.png29 Jul 2012 11:51 | comments.png 0 Comments | tags.png canada enbridge n-america pipeline top [ More ]

Northern Gateway Files Reply Evidence to JRP, Makes Pledge to Heighten Pipeline Safety, Operations Measures
Today Enbridge Inc. (TSX:ENB) (NYSE:ENB) announced Northern Gateway has filed Reply Evidence in the regulatory application for the project and, contained in that filing, details further enhancements in pipeline design and operations. These extra measures build on the plan in the application presently before federal regulators that already far surpasses industry codes and standards.

date.png22 Jul 2012 07:38 | comments.png 0 Comments | tags.png canada enbridge n-america pipeline [ More ]

ERCB Responding To Enbridge Pipeline Pumping Station Release
The ERCB is responding to a release that occurred on Monday, June18, 2012, at a pumping station on Enbridge Inc.’s Athabasca pipeline located approximately 24 kilometres southeast of Elk Point.

date.png21 Jun 2012 07:47 | comments.png 0 Comments | tags.png canada enbridge n-america pipeline [ More ]

Seaway Crude Oil Pipeline Begins First Flow
Enterprise Products Partners L.P. (NYSE: EPD) and Enbridge Inc. (NYSE/TSX:ENB) announced that the Seaway Pipeline began accepting crude oil today at Cushing, Oklahoma for delivery to the U.S. Gulf Coast.

date.png19 May 2012 20:20 | comments.png 0 Comments | tags.png enbridge enterprise n-america pipeline top usa [ More ]

Enterprise and Enbridge Announce Completion of Seaway Pipeline Reversal
Enterprise Products Partners L.P. (NYSE: EPD) and Enbridge Inc. (NYSE/TSX: ENB) today announced that modifications to the Seaway crude oil pipeline allowing it to transport crude oil from Cushing, Oklahoma to the U.S. Gulf Coast have been completed. The pipeline is in the process of being commissioned, and the first flows of crude oil into the line are expected to begin this weekend. The reversal of the 500-mile, 30-inch diameter pipeline, which had been in northbound service since 1995, provides North American producers with the infrastructure needed to access more than 4 million barrels per day (“BPD”) of Gulf Coast refinery demand.

date.png17 May 2012 19:26 | comments.png 0 Comments | tags.png enbridge enterprise n-america pipeline top usa [ More ]

Enbridge Proceeding With $2.6 Billion of Additional Eastern Access Projects
Enbridge Inc. (TSX:ENB) (NYSE:ENB) today announced that it has secured commercial support to proceed with additional Eastern Access projects. Enbridge and Enbridge Energy Partners, L.P. (EEP) (NYSE:EEP) also expect to proceed with supporting expansions of the U.S. mainline system between Flanagan, Illinois and Sarnia, Ontario.

date.png17 May 2012 06:31 | comments.png 0 Comments | tags.png canada enbridge n-america pipeline usa [ More ]

Enbridge Upsizes Capacity of U.S. Gulf Coast Access Projects
Enbridge Inc. (NYSE:ENB) (TSX:ENB) ("Enbridge") today announced that it is upsizing the capacity of its U.S. Gulf Coast Access projects. The Flanagan South Pipeline from Flanagan, Illinois to Cushing, Oklahoma will be upsized to a 36- inch diameter line with an initial capacity of 585,000 barrels per day (bpd). In a separate announcement today, Enbridge and its partner Enterprise Products Partners L.P. indicated that they will twin their jointly owned Seaway Pipeline from Cushing to the U.S. Gulf Coast at Houston, with an extension to Port Arthur/Beaumont, adding 450,000 bpd of capacity to that system.

date.png30 Mar 2012 07:00 | comments.png 0 Comments | tags.png enbridge n-america pipeline usa [ More ]

Enterprise and Enbridge to Proceed With 450,000 Barrel Per Day Expansion of Seaway Crude Oil Pipeline
Enbridge Inc. (NYSE/TSX:ENB) and Enterprise Products Partners L.P. (NYSE:EPD) today announced that they have secured capacity commitments from shippers to proceed with an expansion of the Seaway Pipeline that will more than double its capacity to 850,000 (“BPD”) by mid-2014. During the supplemental binding open commitment period, Enterprise and Enbridge received additional commitments with terms ranging from five to 20 years that support construction of a 512-mile, 30-inch diameter twin (a parallel line) along the route of the Seaway Pipeline, adding 450,000 barrels per day (“BPD”) of capacity to the existing system. This capacity can be cost-effectively expanded on a timely basis with the addition of incremental pump stations.

date.png27 Mar 2012 07:43 | comments.png 0 Comments | tags.png enbridge enterprise pipeline usa [ More ]
Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License