Included page "clone:killajoules" does not exist (create it now)

Apollonia well confirms extension of Júpiter discovery in pre-salt Santos basin
Galp Energia, partner of the consortium for the exploration of Block BM-S-24, informs that the preliminary results obtained during the drilling of well 3-BRSA-1246-RJS (3-RJS-732), informally known as Apollonia, have confirmed the presence of hydrocarbons and the extension of the Júpiter discovery in the pre-salt Santos basin.

date.png14 Aug 2014 06:06 | comments.png 0 Comments | tags.png brazil galp petrobras s-america upstream [ More ]

Galp Energia proves discovery in deepwaters of the Potiguar basin
Galp Energia, partner of the consortium for the exploration of concession BM-POT-17, informs that it concluded the drilling of the exploration well 1-BRS-A-1025-RNS (1-RNS-158), informally known as Pitú, located in the offshore of Potiguar basin, in Brazil. The results proved the discovery, already announced on 17 December 2013, of oil in deepwaters of that basin.

date.png16 Mar 2014 11:36 | comments.png 0 Comments | tags.png brazil galp s-america upstream [ More ]

Pitu well results reveal first oil accumulation in the Potiguar basin
Galp Energia informs about the amendment to the announcement published on 17 December 2013. Regarding the farm-out process between Petrobras and BP Energy do Brasil, Petrobras will remain the operator of concession BM-POT-17, as opposed to what had been previously published. The amended version is contained in the fifth paragraph of the announcement as follows:

date.png26 Dec 2013 17:18 | comments.png 0 Comments | tags.png bp brazil galp petrobras s-america upstream [ More ]

Conclusion of drilling of Iara High Angle well
Galp Energia, partner of the consortium for exploration in block BM-S-11, informs that it concluded the drilling of the well 3-RJS-715D (3-BRSA-1181D-RJS), informally known as Iara High Angle (HA), located in the central area of Iara Evaluation Plan in the pre-salt Santos basin. This is the fifth exploration well in Iara area, being located 4 km to the North of the discovery well (1-RJS-656), informally known as Iara, and 225 km off the coast of Rio de Janeiro at a water depth of 2,128 metres.

date.png16 Nov 2013 21:33 | comments.png 0 Comments | tags.png brazil galp petrobras s-america upstream [ More ]

Conclusion of the drilling and of the formation test of the fourth well in the Iara area
Galp Energia, partner of the consortium for the exploration of block BM-S-11, informs about the conclusion of the drilling and of the formation test of the fourth exploratory well in the Iara area, in block BM-S-11, in the pre-salt of Santos basin.

date.png26 Jul 2013 06:15 | comments.png 0 Comments | tags.png bg-group brazil galp petrobras s-america upstream [ More ]

Murombe-1 exploration well results
Galp Energia announces that the Murombe-1 exploration well, the second well in the 2013 exploration drilling campaign offshore Republic of Namibia, has been concluded and the results proved it to be a dry hole. The Murombe-1 well, located in the Petroleum Exploration License (PEL) 23 and spudded on June 1, was drilled in water depths of circa 1,390 meters and has reached a final depth of 5,729 meters. The well is currently being plugged and abandoned.

date.png23 Jul 2013 07:28 | comments.png 0 Comments | tags.png africa galp namibia upstream [ More ]

Galp Energia acquires nine blocks on the first day of the 11th bidding round
Galp Energia participated on the first day of the 11th bidding round for exploratory blocks organized by the National Petroleum, Natural Gas and Biofuels Agency (“ANP”), that was held today in Rio de Janeiro, Brazil.

date.png17 May 2013 20:09 | comments.png 0 Comments | tags.png brazil galp s-america upstream [ More ]

Fourth well in the Iara area confirms extension of discovery in pre-salt of Santos Basin
Galp Energia, partner of the consortium for the exploration of block BM-S-11, informs about results from the well 3-BRSA-1132-RJS (3-RJS-706), informally known as Iara West-2, located in the Iara Evaluation Area, in the pre-salt of Santos Basin.

date.png07 Mar 2013 13:37 | comments.png 0 Comments | tags.png bg-group brazil galp petrobras s-america upstream [ More ]

The hydrocracker at Sines refinery begins operations
Galp Energia informs that on 10 January, the hydrocracking complex installed at the Sines refinery, under the refineries upgrade project, began the commercial production stage. This event marks the conclusion of the upgrade project at the Sines and Matosinhos refineries, initiating a new era in Galp Energia’s refining business.

date.png16 Jan 2013 19:14 | comments.png 0 Comments | tags.png europe galp portugal refinery [ More ]

Carcará well confirms relevant potential of the block BM-S-8 in the pre-salt Santos basin
Galp Energia, partner of the consortium for the exploration of block BM-S-8, informs about the conclusion of the drilling of the well 4-SPS-86B (4-BRSA-971-SPS), located in the block BM-S-8, in ultra-deep waters of the pre-salt Santos basin. This is the third well drilled in the area of the Evaluation Plan approved for the 1-BRSA-532A-SPS (Bem-te-vi) discovery.

date.png03 Jan 2013 09:03 | comments.png 0 Comments | tags.png brazil galp petrobras s-america upstream [ More ]
page 1 of 41234next »
Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License