Included page "clone:killajoules" does not exist (create it now)

BP Successfully Completes Deepwater Appraisal Well off Brazil
BP today announced that a Notification of Discovery for the Itaipu-2 pre-salt appraisal well, located in block BM-C-32 in the deepwater sector of the Campos Basin, has been lodged with the Brazilian National Petroleum Agency (ANP). The well, approximately 130km offshore Brazil, was drilled to a total depth of 4,877 metres in 1,420 metres water depth. Itaipu-2 delineates the discovery made in 2009-10 in Itaipu-1 some 7km to the northwest.

date.png10 Nov 2011 10:44 | comments.png 0 Comments | tags.png anadarko bp brazil maersk s-america upstream [ More ]

Discovery of New Gas Accumulation in Espírito Santo Basin
Petróleo Brasileiro S.A. - Petrobras announces the discovery of a new gas accumulation in the post-salt of the Espírito Santo Basin, in Concession BM-ES-21 (Block ES-M-414). The discovery lies 135 km from the city of Vitória, in the State of Espírito Santo.

date.png04 Nov 2011 07:47 | comments.png 0 Comments | tags.png brazil petrobras s-america upstream [ More ]

HRT informs the discovery of hydrocarbons in the well 1-HRT-3-AM, Block SOL-T-168, in the Solimões Sedimentary Basin
Rio de Janeiro, Brazil, September 16, 2011 - HRT Participações em Petróleo S.A. (the “Company” or “HRT”) (BM&FBOVESPA: HRTP3, TSX-V: HRP) informs that its subsidiary, HRT O&G Exploração e Produção de Petróleo Ltda. (“HRT O&G”), forwarded today to the National Petroleum, Natural Gas and Biofuels Agency (Agência Nacional do Petróleo, Gás Natural e Biocombustíveis - ANP), a Notice of Discovery to the effect that gaseous and liquid hydrocarbons have been observed in well 1-HRT-3-AM, located in the Block SOL-T-168, in the Solimões Sedimentary Basin. The well is positioned at 7.5 km northwest of the Municipal District of Carauari, in the State of Amazonas, and was drilled by rig QG-IX (Queiroz Galvão).

date.png19 Sep 2011 13:54 | comments.png 0 Comments | tags.png brazil hrt s-america upstream [ More ]

Statoil Portfolio adjustment in Brazil
Statoil is farming down 10% and 15%, respectively, of its participating interests in the exploration licences BM-CAL-7 and BM-CAL-10 in the Camamu-Almada basin offshore Brazil to Canadian company Gran Tierra Energy.

date.png15 Sep 2011 21:55 | comments.png 0 Comments | tags.png brazil s-america statoil upstream [ More ]

Brownstone Energy Provides Update On Operations In Colombia
Brownstone Energy Inc. (TSXV: BWN; OTCQX: BWSOF) (“Brownstone”) is pleased to provide the following update on its operations in Colombia.

date.png15 Sep 2011 10:31 | comments.png 0 Comments | tags.png brownstone colombia s-america upstream [ More ]

MODEC Secures Award for OSX-3 FPSO
MODEC, Inc. (MODEC) announced today that OSX 3 Leasing B.V. has signed an EPCI contract for the supply of the OSX-3 FPSO, a Floating, Production, Storage, and Offloading (FPSO) unit to be utilized within block BM-C-39 of the Campos Basin, offshore Brazil, on the Waikiki Pero Inga fields. OSX 3 Leasing B.V. is a subsidiary of OSX Brasil S.A., an EBX Group Company. The Letter of Intent was issued to MODEC on June 1, 2011.

date.png22 Jul 2011 07:23 | comments.png 0 Comments | tags.png brazil modec osx s-america services [ More ]

Financial resources secured to expand the capacity of El Palito and Puerto La Cruz refineries
As part of the strategy of diversifying markets and sources of funding, officials of Petroleos de Venezuela SA (PDVSA) and the Japan Bank for International Cooperation (JBIC) signed an agreement for a credit transaction for an amount of 1,500 million dollars for projects of deep conversion to the refineries in El Palito (REP), and Puerto La Cruz (PLC) located in Carabobo and Anzoategui states, respectively.

date.png01 Jul 2011 05:57 | comments.png 0 Comments | tags.png pdvsa refinery s-america venezuela [ More ]

El Palito refinery FCC Back Online after Fire
Petroleos de Venezuela Socialist community informs of the commissioning of the Catalytic Cracking Unit (FCC) of the El Palito refinery, after the work done in the aforementioned soft start producing plant materials for the fuel mix.

Jesus Sanchez, general manager of the El Palito refinery (REP), said that occur after the power failure on Monday 21 March, PDVSA staff Socialist Carabobo refining complex met the operational and safety procedures for commissioning service units and conversion Distillation Media, as well as industrial services.

"As previously announced, this weekend was completed startup REP units and thus the normalization of the complex, producing the different fuels refining our center daily supplies to 10 states.

date.png28 Mar 2011 05:53 | comments.png 0 Comments | tags.png pdvsa refinery s-america venezuela [ More ]

Petrobras Start of EWT in pre-salt of Marlim Leste field
Petróleo Brasileiro S.A. – Petrobras announces the start up of the Extended Well Test (EWT) for the Tracajá reservoir, located 124 km off the coast of Rio de Janeiro, in the pre-salt area of Marlim Leste field, in Campos Basin.

date.png01 Mar 2011 06:30 | comments.png 0 Comments | tags.png brazil offshore petrobras s-america upstream [ More ]

Ecopetrol and Talisman Energy finalize the purchase of BP in Colombia and announce change of company name
Once obtained the corresponding authorizations, Ecopetrol S.A. (Ecopetrol) and Talisman Colombia Holdco Limited (Talisman) completed today the acquisition of BP Exploration Company (Colombia) Limited for US$1.750 billion. Ecopetrol will have 51% of the new company and Talisman the remaining 49%.

date.png25 Jan 2011 10:07 | comments.png 0 Comments | tags.png colombia deals ecopetrol s-america talisman [ More ]
page 28 of 29« previous12...26272829next »
Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License