<?xml version="1.0" encoding="UTF-8" ?>
<rss version="2.0" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:wikidot="http://www.wikidot.com/rss-namespace">

	<channel>
		<title>My Blog</title>
		<link>http://killajoules.wikidot.com</link>
		<description>Oil &amp; Gas Sector News</description>
				<copyright></copyright>
		<lastBuildDate>Wed, 19 Aug 2026 08:58:46 +0000</lastBuildDate>
		
					<item>
				<guid>http://killajoules.wikidot.com/blog:6079</guid>
				<title>Enterprise Offering Additional Capacity on Aegis Ethane Pipeline System</title>
				<link>http://killajoules.wikidot.com/blog:6079</link>
				<description>

&lt;p&gt;Enterprise Products Partners L.P. (NYSE:EPD) today announced it will be conducting a binding open commitment period to gauge shipper support for a proposed expansion of the &lt;a href=&quot;http://abarrelfull.wikidot.com/enterprise-aegis-ethane-pipeline&quot;&gt;Aegis pipeline&lt;/a&gt;. The 270-mile Aegis system is designed to transport purity ethane from Enterprise’s Mont Belvieu, Texas liquids storage complex to petrochemical facilities in Texas and Louisiana.&lt;/p&gt;
&lt;p&gt;by &lt;span class=&quot;printuser avatarhover&quot;&gt;&lt;a href=&quot;http://www.wikidot.com/user:info/abarrelfull&quot;  &gt;&lt;img class=&quot;small&quot; src=&quot;http://www.wikidot.com/avatar.php?userid=418097&amp;amp;amp;size=small&amp;amp;amp;timestamp=1787129926&quot; alt=&quot;abarrelfull&quot; style=&quot;background-image:url(http://www.wikidot.com/userkarma.php?u=418097)&quot; /&gt;&lt;/a&gt;&lt;a href=&quot;http://www.wikidot.com/user:info/abarrelfull&quot;  &gt;abarrelfull&lt;/a&gt;&lt;/span&gt;&lt;/p&gt;
</description>
				<pubDate>Fri, 06 Nov 2015 08:00:50 +0000</pubDate>
												<content:encoded>
					<![CDATA[
						 <p>Enterprise Products Partners L.P. (NYSE:EPD) today announced it will be conducting a binding open commitment period to gauge shipper support for a proposed expansion of the <a href="http://abarrelfull.wikidot.com/enterprise-aegis-ethane-pipeline">Aegis pipeline</a>. The 270-mile Aegis system is designed to transport purity ethane from Enterprise’s Mont Belvieu, Texas liquids storage complex to petrochemical facilities in Texas and Louisiana.</p> <p>The initial 60-mile segment from Mont Belvieu to Beaumont, Texas began service in September of 2014, followed by the 48-mile portion from Beaumont to Lake Charles, Louisiana in September of 2015. The remainder of the Aegis pipeline, which will extend to the Mississippi River corridor area, is on schedule for completion by the end of 2015.</p> <p>The incremental capacity being offered reflects the continued strong interest in the Aegis pipeline and marks the second supplemental open season to expand the system. The expanded capabilities of the Aegis system, which are being achieved by the addition of pumps and related infrastructure, is expected to come online in stages through 2019, depending on the level of customer commitments.</p> <ul> <li><a href="http://phx.corporate-ir.net/phoenix.zhtml?c=80547&amp;p=irol-newsArticle&amp;ID=2104635">Enterprise Offering Additional Capacity on Aegis Ethane Pipeline System</a></li> </ul> <div style="clear:both; height: 0px; font-size: 1px"></div> <hr /> <table style="margin: 0 10px;"> <tr style="vertical-align:top; align:center"> <td style="padding: 10px; width: 100%;"> <p><strong>Related News</strong></p> <p><strong>Looking for information on the Pipeline sector?</strong></p> <ul> <li><a href="http://abarrelfull.wikidot.com/oil-and-gas-pipelines">Oil and Gas Pipelines</a></li> <li><a href="http://abarrelfull.wikidot.com/construction-and-engineering-companies-pipeline-references">Construction And Engineering Companies Pipeline References</a></li> </ul> </td> <td style="padding: 10px; width: 100%;"> <p><iframe src="https://www.flickr.com/photos/royaldutchshell/5135764786/in/set-72157625287640424/player/" width="240" height="160" frameborder="0" allowfullscreen="allowfullscreen" webkitallowfullscreen="" mozallowfullscreen="" oallowfullscreen="" msallowfullscreen=""></iframe></p> </td> </tr> </table> <p>by <span class="printuser avatarhover"><a href="http://www.wikidot.com/user:info/abarrelfull" ><img class="small" src="http://www.wikidot.com/avatar.php?userid=418097&amp;amp;size=small&amp;amp;timestamp=1787129926" alt="abarrelfull" style="background-image:url(http://www.wikidot.com/userkarma.php?u=418097)" /></a><a href="http://www.wikidot.com/user:info/abarrelfull" >abarrelfull</a></span></p> 
				 	]]>
				</content:encoded>							</item>
					<item>
				<guid>http://killajoules.wikidot.com/blog:5954</guid>
				<title>Enterprise to Sell Offshore Gulf of Mexico Business to Genesis</title>
				<link>http://killajoules.wikidot.com/blog:5954</link>
				<description>

&lt;p&gt;Enterprise Products Partners L.P. (NYSE:EPD) today announced that it has executed definitive agreements to sell its offshore Gulf of Mexico pipelines and services business, which primarily consists of its Offshore Pipelines &amp;amp; Services business segment to Genesis Energy, L.P. (“Genesis”) for approximately $1.5 billion in cash. The transaction is expected to close during the third quarter of 2015. Enterprise’s offshore assets include its ownership interest in nine crude oil pipeline systems with more than 1,100 miles of pipeline; nine natural gas pipeline systems totaling approximately 1,200 miles of pipeline; and its ownership interest in six offshore hub platforms.&lt;/p&gt;
&lt;p&gt;by &lt;span class=&quot;printuser avatarhover&quot;&gt;&lt;a href=&quot;http://www.wikidot.com/user:info/abarrelfull&quot;  &gt;&lt;img class=&quot;small&quot; src=&quot;http://www.wikidot.com/avatar.php?userid=418097&amp;amp;amp;size=small&amp;amp;amp;timestamp=1787129926&quot; alt=&quot;abarrelfull&quot; style=&quot;background-image:url(http://www.wikidot.com/userkarma.php?u=418097)&quot; /&gt;&lt;/a&gt;&lt;a href=&quot;http://www.wikidot.com/user:info/abarrelfull&quot;  &gt;abarrelfull&lt;/a&gt;&lt;/span&gt;&lt;/p&gt;
</description>
				<pubDate>Tue, 21 Jul 2015 08:47:55 +0000</pubDate>
												<content:encoded>
					<![CDATA[
						 <p>Enterprise Products Partners L.P. (NYSE:EPD) today announced that it has executed definitive agreements to sell its offshore Gulf of Mexico pipelines and services business, which primarily consists of its Offshore Pipelines &amp; Services business segment to Genesis Energy, L.P. (“Genesis”) for approximately $1.5 billion in cash. The transaction is expected to close during the third quarter of 2015. Enterprise’s offshore assets include its ownership interest in nine crude oil pipeline systems with more than 1,100 miles of pipeline; nine natural gas pipeline systems totaling approximately 1,200 miles of pipeline; and its ownership interest in six offshore hub platforms.</p> <p>“We are pleased to execute this agreement to sell our offshore Gulf of Mexico business to Genesis,” said Michael A. Creel, chief executive officer for Enterprise’s general partner. “In recent years, earnings from our offshore business represented only three percent of Enterprise’s gross operating margin, and our offshore assets do not effectively integrate with our downstream crude oil and natural gas pipeline systems. We plan to redeploy proceeds from this sale into attractive growth opportunities that would extend and expand our integrated midstream system and should generate higher risk-adjusted returns on capital, such as acquisitions and organic projects in the Eagle Ford and Permian shale plays. In addition to enhancing our overall financial flexibility, the proceeds from this sale will effectively provide funds to finance the first installment of our recent acquisition of EFS Midstream LLC in the Eagle Ford and, furthermore, eliminates our need for equity capital for the remainder of 2015 based on our current expectations.”</p> <p>“I cannot think of a better owner for the future development of these assets than Genesis. For over twenty years, Grant Sims, the chief executive officer of Genesis, has been a pioneer and a visionary in the development of midstream energy infrastructure in the Gulf of Mexico. These assets should be very complementary to Genesis’ existing offshore investments. Furthermore we would like to thank the Enterprise employees who will join Genesis in this transaction. These employees have built and operated award-winning offshore assets such as the Independence Hub platform and Trail pipeline and the Poseidon, Cameron Highway, Shenzi and Southeast Keathley Canyon crude oil pipelines in a safe and efficient manner,” stated Creel.</p> <h4><span>Pipelines</span></h4> <ul> <li><a href="http://abarrelfull.wikidot.com/independence-trail-natural-gas-pipeline">Independence Trail</a></li> <li><a href="http://abarrelfull.wikidot.com/viosca-knoll-gas-pipeline-system">Viosca Knoll Gathering System</a></li> <li><a href="http://abarrelfull.wikidot.com/high-island-offshore-natural-gas-pipeline-system">High Island Offshore System (HIOS)</a></li> <li><a href="http://abarrelfull.wikidot.com/falcon-natural-gas-pipeline">Falcon Natural Gas Pipeline</a></li> <li>Green Canyon Laterals</li> <li><a href="http://abarrelfull.wikidot.com/anaconda-natural-gas-pipeline">Anaconda Gathering System</a></li> <li><a href="http://abarrelfull.wikidot.com/manta-ray-gas-pipeline-system">Manta Ray Offshore Gathering System</a></li> <li><a href="http://abarrelfull.wikidot.com/nautilus-gas-pipeline">Nautilus Pipeline System</a></li> <li>Nemo Pipeline</li> <li><a href="http://abarrelfull.wikidot.com/vesco-gas-gathering-pipeline-system">VESCO Gathering System</a></li> </ul> <p>Enterprise expects to record non-cash asset impairment and related charges of approximately $100 million, or $0.05 per common unit on a fully-diluted basis in connection with the sale of its offshore Gulf of Mexico pipelines and services business. Since these assets were viewed as held-for-sale at June 30, 2015, these non-cash charges will be reflected in Enterprise’s consolidated results for the three and six months ended June 30, 2015.</p> <ul> <li><a href="http://phx.corporate-ir.net/phoenix.zhtml?c=80547&amp;p=irol-newsArticle&amp;ID=2068260">Enterprise to Sell Offshore Gulf of Mexico Business to Genesis</a></li> </ul> <div style="clear:both; height: 0px; font-size: 1px"></div> <hr /> <table style="margin: 0 10px;"> <tr style="vertical-align:top; align:center"> <td style="padding: 10px; width: 100%;"> <p><strong>Related News</strong></p> <p><strong>Looking for information on the Pipeline sector?</strong></p> <ul> <li><a href="http://abarrelfull.wikidot.com/oil-and-gas-pipelines">Oil and Gas Pipelines</a></li> <li><a href="http://abarrelfull.wikidot.com/construction-and-engineering-companies-pipeline-references">Construction And Engineering Companies Pipeline References</a></li> </ul> </td> <td style="padding: 10px; width: 100%;"> <p><iframe src="https://www.flickr.com/photos/royaldutchshell/5135764786/in/set-72157625287640424/player/" width="240" height="160" frameborder="0" allowfullscreen="allowfullscreen" webkitallowfullscreen="" mozallowfullscreen="" oallowfullscreen="" msallowfullscreen=""></iframe></p> </td> </tr> </table> <p>by <span class="printuser avatarhover"><a href="http://www.wikidot.com/user:info/abarrelfull" ><img class="small" src="http://www.wikidot.com/avatar.php?userid=418097&amp;amp;size=small&amp;amp;timestamp=1787129926" alt="abarrelfull" style="background-image:url(http://www.wikidot.com/userkarma.php?u=418097)" /></a><a href="http://www.wikidot.com/user:info/abarrelfull" >abarrelfull</a></span></p> 
				 	]]>
				</content:encoded>							</item>
					<item>
				<guid>http://killajoules.wikidot.com/blog:5942</guid>
				<title>Enterprise Signs Additional Commitment for Aegis Ethane Pipeline</title>
				<link>http://killajoules.wikidot.com/blog:5942</link>
				<description>

&lt;p&gt;Enterprise Products Partners L.P. (NYSE:EPD) today announced it has executed a long-term agreement for incremental ethane transportation capacity on the partnership’s &lt;a href=&quot;http://abarrelfull.wikidot.com/enterprise-aegis-ethane-pipeline&quot;&gt;Aegis pipeline&lt;/a&gt;. With this agreement, total capacity commitments for the Aegis pipeline will ramp up over the next four years to more than 300,000 barrels per day (&amp;quot;BPD&amp;quot;).&lt;/p&gt;
&lt;p&gt;by &lt;span class=&quot;printuser avatarhover&quot;&gt;&lt;a href=&quot;http://www.wikidot.com/user:info/abarrelfull&quot;  &gt;&lt;img class=&quot;small&quot; src=&quot;http://www.wikidot.com/avatar.php?userid=418097&amp;amp;amp;size=small&amp;amp;amp;timestamp=1787129926&quot; alt=&quot;abarrelfull&quot; style=&quot;background-image:url(http://www.wikidot.com/userkarma.php?u=418097)&quot; /&gt;&lt;/a&gt;&lt;a href=&quot;http://www.wikidot.com/user:info/abarrelfull&quot;  &gt;abarrelfull&lt;/a&gt;&lt;/span&gt;&lt;/p&gt;
</description>
				<pubDate>Tue, 14 Jul 2015 10:48:17 +0000</pubDate>
												<content:encoded>
					<![CDATA[
						 <p>Enterprise Products Partners L.P. (NYSE:EPD) today announced it has executed a long-term agreement for incremental ethane transportation capacity on the partnership’s <a href="http://abarrelfull.wikidot.com/enterprise-aegis-ethane-pipeline">Aegis pipeline</a>. With this agreement, total capacity commitments for the Aegis pipeline will ramp up over the next four years to more than 300,000 barrels per day (&quot;BPD&quot;).</p> <p>“Enterprise is very pleased to enter into this agreement and provide the midstream services necessary to support the continued growth of the petrochemical industry along the Gulf Coast,” said Michael A. Creel, chief executive officer of Enterprise’s general partner.</p> <p>The Aegis pipeline, which originates at Enterprise’s natural gas liquids fractionation and storage complex in Mont Belvieu, Texas, extends 270 miles to Napoleonville, Louisiana. The initial 60-mile segment between Mont Belvieu and Beaumont, Texas began service in September of 2014. The remaining portion is scheduled for completion by the end of 2015. Capacity on the pipeline can be expanded to approximately 400,000 BPD.</p> <p>When completed, Aegis will be part of a 500-mile ethane header system stretching from Corpus Christi, Texas to the Mississippi River. This header system will serve as a major ethane supply artery for more than 20 petrochemical facilities expected to represent over 90 percent of domestic ethylene production capacity by 2020.</p> <ul> <li><a href="http://phx.corporate-ir.net/phoenix.zhtml?c=80547&amp;p=irol-newsArticle&amp;ID=2064267">Enterprise Signs Additional Commitment for Aegis Ethane Pipeline</a></li> </ul> <div style="clear:both; height: 0px; font-size: 1px"></div> <hr /> <table style="margin: 0 10px;"> <tr style="vertical-align:top; align:center"> <td style="padding: 10px; width: 100%;"> <p><strong>Related News</strong></p> <p><strong>Looking for information on the Pipeline sector?</strong></p> <ul> <li><a href="http://abarrelfull.wikidot.com/oil-and-gas-pipelines">Oil and Gas Pipelines</a></li> <li><a href="http://abarrelfull.wikidot.com/construction-and-engineering-companies-pipeline-references">Construction And Engineering Companies Pipeline References</a></li> </ul> </td> <td style="padding: 10px; width: 100%;"> <p><iframe src="https://www.flickr.com/photos/royaldutchshell/5135764786/in/set-72157625287640424/player/" width="240" height="160" frameborder="0" allowfullscreen="allowfullscreen" webkitallowfullscreen="" mozallowfullscreen="" oallowfullscreen="" msallowfullscreen=""></iframe></p> </td> </tr> </table> <p>by <span class="printuser avatarhover"><a href="http://www.wikidot.com/user:info/abarrelfull" ><img class="small" src="http://www.wikidot.com/avatar.php?userid=418097&amp;amp;size=small&amp;amp;timestamp=1787129926" alt="abarrelfull" style="background-image:url(http://www.wikidot.com/userkarma.php?u=418097)" /></a><a href="http://www.wikidot.com/user:info/abarrelfull" >abarrelfull</a></span></p> 
				 	]]>
				</content:encoded>							</item>
					<item>
				<guid>http://killajoules.wikidot.com/blog:5863</guid>
				<title>Enterprise to Build New Crude Oil and Condensate Pipeline from Midland to Houston</title>
				<link>http://killajoules.wikidot.com/blog:5863</link>
				<description>

&lt;p&gt;Enterprise Products Partners L.P. (NYSE:EPD) today announced it has executed long-term agreements that support development of a new 416-mile, 24-inch diameter pipeline to transport crude oil and condensate from the company’s Midland, Texas terminal to its Sealy storage facility west of Houston. From Sealy, the new pipeline would link to Enterprise’s &lt;a href=&quot;http://abarrelfull.wikidot.com/enterprise-crude-houston-echo-terminal&quot;&gt;ECHO terminal&lt;/a&gt; through an interconnect with the Rancho II pipeline, which is scheduled to be in service in July 2015. Through ECHO, customers will have direct access to every refinery in Houston, Texas City, Beaumont and Port Arthur, as well as Enterprise’s dock facilities.&lt;/p&gt;
&lt;p&gt;by &lt;span class=&quot;printuser avatarhover&quot;&gt;&lt;a href=&quot;http://www.wikidot.com/user:info/abarrelfull&quot;  &gt;&lt;img class=&quot;small&quot; src=&quot;http://www.wikidot.com/avatar.php?userid=418097&amp;amp;amp;size=small&amp;amp;amp;timestamp=1787129926&quot; alt=&quot;abarrelfull&quot; style=&quot;background-image:url(http://www.wikidot.com/userkarma.php?u=418097)&quot; /&gt;&lt;/a&gt;&lt;a href=&quot;http://www.wikidot.com/user:info/abarrelfull&quot;  &gt;abarrelfull&lt;/a&gt;&lt;/span&gt;&lt;/p&gt;
</description>
				<pubDate>Fri, 01 May 2015 09:11:10 +0000</pubDate>
												<content:encoded>
					<![CDATA[
						 <p>Enterprise Products Partners L.P. (NYSE:EPD) today announced it has executed long-term agreements that support development of a new 416-mile, 24-inch diameter pipeline to transport crude oil and condensate from the company’s Midland, Texas terminal to its Sealy storage facility west of Houston. From Sealy, the new pipeline would link to Enterprise’s <a href="http://abarrelfull.wikidot.com/enterprise-crude-houston-echo-terminal">ECHO terminal</a> through an interconnect with the Rancho II pipeline, which is scheduled to be in service in July 2015. Through ECHO, customers will have direct access to every refinery in Houston, Texas City, Beaumont and Port Arthur, as well as Enterprise’s dock facilities.</p> <p>The new pipeline will have the capability to provide up to 540,000 barrels per day (“BPD”) of take-away capacity for growing volumes of crude oil, and condensate from the Permian Basin. Service is expected to begin in the second quarter of 2017.</p> <p>The hydrocarbons will be gathered by trucks and pipelines into Enterprise’s Midland terminal and then delivered in up to four segregated batches to Sealy. The different grades of hydrocarbons handled by the Midland-to-Sealy pipeline include West Texas Sour, West Texas Intermediate, Light West Texas Intermediate and condensate. Enterprise is in the process of adding incremental storage capacity to support the new pipeline and the existing West Texas Gathering System.</p> <p>“The commitments we received for the Midland-to-Sealy pipeline reflect the long-term, positive outlook producers have for the Permian Basin and the value provided by this logical expansion of our integrated energy value chain,” said Michael A. Creel, chief executive officer of Enterprise’s general partner. “In addition to facilitating crude oil and condensate production from one of our most important domestic basins, the Midland-to-Sealy pipeline will provide customers with adequate supply out of the Permian Basin and unsurpassed market access to the vast Gulf Coast refining complex, as well as dock access necessary for growing export opportunities.”</p> <p>Creel added, “Proper segregation is essential when transporting batched products and we take that responsibility very seriously. In support of that commitment Enterprise has implemented a system designed to ensure the company complies with all appropriate regulations.”</p> <p>Enterprise now has approximately $7.5 billion of capital growth projects under construction, several of which will benefit customers on the new Midland-to-Sealy pipeline. Specifically, the 36-inch diameter Rancho II pipeline, which extends 88 miles from Sealy, to the ECHO terminal, will have over one million BPD of capacity for crude oil and condensate from the Permian Basin and the Eagle Ford Shale.</p> <ul> <li><a href="http://phx.corporate-ir.net/phoenix.zhtml?c=80547&amp;p=irol-newsArticle&amp;ID=2042799">Enterprise to Build New Crude Oil and Condensate Pipeline from Midland to Houston</a></li> </ul> <div style="clear:both; height: 0px; font-size: 1px"></div> <hr /> <table style="margin: 0 10px;"> <tr style="vertical-align:top; align:center"> <td style="padding: 10px; width: 100%;"> <p><strong>Related News</strong></p> <p><strong>Looking for information on the Pipeline sector?</strong></p> <ul> <li><a href="http://abarrelfull.wikidot.com/oil-and-gas-pipelines">Oil and Gas Pipelines</a></li> <li><a href="http://abarrelfull.wikidot.com/construction-and-engineering-companies-pipeline-references">Construction And Engineering Companies Pipeline References</a></li> </ul> </td> <td style="padding: 10px; width: 100%;"> <p><iframe src="https://www.flickr.com/photos/royaldutchshell/5135764786/in/set-72157625287640424/player/" width="240" height="160" frameborder="0" allowfullscreen="allowfullscreen" webkitallowfullscreen="" mozallowfullscreen="" oallowfullscreen="" msallowfullscreen=""></iframe></p> </td> </tr> </table> <p>by <span class="printuser avatarhover"><a href="http://www.wikidot.com/user:info/abarrelfull" ><img class="small" src="http://www.wikidot.com/avatar.php?userid=418097&amp;amp;size=small&amp;amp;timestamp=1787129926" alt="abarrelfull" style="background-image:url(http://www.wikidot.com/userkarma.php?u=418097)" /></a><a href="http://www.wikidot.com/user:info/abarrelfull" >abarrelfull</a></span></p> 
				 	]]>
				</content:encoded>							</item>
					<item>
				<guid>http://killajoules.wikidot.com/blog:5830</guid>
				<title>Enterprise Products Increases Loading Capacity at Houston Ship Channel LPG Export Terminal</title>
				<link>http://killajoules.wikidot.com/blog:5830</link>
				<description>

&lt;p&gt;Enterprise Products Partners L.P. (NYSE:EPD) today announced the recent completion of an expansion project at its liquefied petroleum gas (“LPG”) export terminal at the Houston Ship Channel, which will increase the facility’s capacity for loading fully refrigerated, low-ethane propane to 9 million barrels (“MMBbls”) per month. Enhancements to existing refrigeration infrastructure, designed to add 2,500 barrels per hour (“BPH”) or 1.5 MMBbls per month of incremental loading capacity, will allow Enterprise to accommodate an additional three ships per month.&lt;/p&gt;
&lt;p&gt;by &lt;span class=&quot;printuser avatarhover&quot;&gt;&lt;a href=&quot;http://www.wikidot.com/user:info/abarrelfull&quot;  &gt;&lt;img class=&quot;small&quot; src=&quot;http://www.wikidot.com/avatar.php?userid=418097&amp;amp;amp;size=small&amp;amp;amp;timestamp=1787129926&quot; alt=&quot;abarrelfull&quot; style=&quot;background-image:url(http://www.wikidot.com/userkarma.php?u=418097)&quot; /&gt;&lt;/a&gt;&lt;a href=&quot;http://www.wikidot.com/user:info/abarrelfull&quot;  &gt;abarrelfull&lt;/a&gt;&lt;/span&gt;&lt;/p&gt;
</description>
				<pubDate>Wed, 15 Apr 2015 14:24:04 +0000</pubDate>
												<content:encoded>
					<![CDATA[
						 <p>Enterprise Products Partners L.P. (NYSE:EPD) today announced the recent completion of an expansion project at its liquefied petroleum gas (“LPG”) export terminal at the Houston Ship Channel, which will increase the facility’s capacity for loading fully refrigerated, low-ethane propane to 9 million barrels (“MMBbls”) per month. Enhancements to existing refrigeration infrastructure, designed to add 2,500 barrels per hour (“BPH”) or 1.5 MMBbls per month of incremental loading capacity, will allow Enterprise to accommodate an additional three ships per month.</p> <p>Work is also progressing on construction of a new refrigeration train that will increase loading rates by another 11,000 BPH and is on schedule for completion in the fourth quarter of 2015. Once the final expansion phase has been completed, Enterprise will have the capability to load up to 16 MMBbls per month of LPG, which equates to 29 vessels.</p> <p>“With these expansion projects, Enterprise is demonstrating its commitment to supporting the producers who have done a miraculous job of developing our domestic reserves, particularly in the shale basins across the country,” said A.J. “Jim” Teague, chief operating officer of Enterprise’s general partner. “By increasing capacity at our LPG export terminal, we are providing customers with access to international markets, which helps facilitate continued domestic production that would otherwise be significantly curtailed.”</p> <p>Enterprise’s LPG terminal has been instrumental in transforming the U.S. into the largest propane exporter in the world and currently has approximately 1,800 cargoes scheduled from 2015 to 2024. To help ensure adequate supply to the docks, the partnership is in the final stages of completing a dedicated 30-inch diameter LPG pipeline from Mont Belvieu, Texas to the terminal.</p> <ul> <li><a href="http://phx.corporate-ir.net/phoenix.zhtml?c=80547&amp;p=irol-newsArticle&amp;ID=2032460">Enterprise Products Increases Loading Capacity at Houston Ship Channel LPG Export Terminal</a></li> </ul> <div style="clear:both; height: 0px; font-size: 1px"></div> <hr /> <table style="margin: 0 10px;"> <tr style="vertical-align:top; align:center"> <td style="padding: 10px; width: 100%;"> <p><strong>Related News</strong></p> <p><strong>Looking for information on the Pipeline sector?</strong></p> <ul> <li><a href="http://abarrelfull.wikidot.com/oil-and-gas-pipelines">Oil and Gas Pipelines</a></li> <li><a href="http://abarrelfull.wikidot.com/construction-and-engineering-companies-pipeline-references">Construction And Engineering Companies Pipeline References</a></li> </ul> </td> <td style="padding: 10px; width: 100%;"> <p><iframe src="https://www.flickr.com/photos/royaldutchshell/5135764786/in/set-72157625287640424/player/" width="240" height="160" frameborder="0" allowfullscreen="allowfullscreen" webkitallowfullscreen="" mozallowfullscreen="" oallowfullscreen="" msallowfullscreen=""></iframe></p> </td> </tr> </table> <p>by <span class="printuser avatarhover"><a href="http://www.wikidot.com/user:info/abarrelfull" ><img class="small" src="http://www.wikidot.com/avatar.php?userid=418097&amp;amp;size=small&amp;amp;timestamp=1787129926" alt="abarrelfull" style="background-image:url(http://www.wikidot.com/userkarma.php?u=418097)" /></a><a href="http://www.wikidot.com/user:info/abarrelfull" >abarrelfull</a></span></p> 
				 	]]>
				</content:encoded>							</item>
					<item>
				<guid>http://killajoules.wikidot.com/blog:5829</guid>
				<title>Enterprise Offering Additional Capacity on Aegis Ethane Pipeline System</title>
				<link>http://killajoules.wikidot.com/blog:5829</link>
				<description>

&lt;p&gt;Enterprise Products Partners L.P. (NYSE:EPD) today announced the start of a supplemental binding open commitment period to determine shipper demand for incremental capacity being added on the &lt;a href=&quot;http://abarrelfull.wikidot.com/enterprise-aegis-ethane-pipeline&quot;&gt;Aegis pipeline&lt;/a&gt; between Mont Belvieu, Texas and the Napoleonville, Louisiana area along the Mississippi River corridor. The 270-mile Aegis pipeline system is designed to transport purity ethane from Enterprise’s Mont Belvieu, Texas liquids storage complex to petrochemical facilities in Texas and Louisiana.&lt;/p&gt;
&lt;p&gt;by &lt;span class=&quot;printuser avatarhover&quot;&gt;&lt;a href=&quot;http://www.wikidot.com/user:info/abarrelfull&quot;  &gt;&lt;img class=&quot;small&quot; src=&quot;http://www.wikidot.com/avatar.php?userid=418097&amp;amp;amp;size=small&amp;amp;amp;timestamp=1787129926&quot; alt=&quot;abarrelfull&quot; style=&quot;background-image:url(http://www.wikidot.com/userkarma.php?u=418097)&quot; /&gt;&lt;/a&gt;&lt;a href=&quot;http://www.wikidot.com/user:info/abarrelfull&quot;  &gt;abarrelfull&lt;/a&gt;&lt;/span&gt;&lt;/p&gt;
</description>
				<pubDate>Wed, 15 Apr 2015 14:21:44 +0000</pubDate>
												<content:encoded>
					<![CDATA[
						 <p>Enterprise Products Partners L.P. (NYSE:EPD) today announced the start of a supplemental binding open commitment period to determine shipper demand for incremental capacity being added on the <a href="http://abarrelfull.wikidot.com/enterprise-aegis-ethane-pipeline">Aegis pipeline</a> between Mont Belvieu, Texas and the Napoleonville, Louisiana area along the Mississippi River corridor. The 270-mile Aegis pipeline system is designed to transport purity ethane from Enterprise’s Mont Belvieu, Texas liquids storage complex to petrochemical facilities in Texas and Louisiana.</p> <p>The initial 60-mile segment from Mont Belvieu to Beaumont, Texas began service in September of 2014. The remainder of the Aegis pipeline will be completed in two phases, which are scheduled for completion by the end of 2015.</p> <p>The incremental capacity associated with this open season will be achieved through the installation of additional pumps. The additional capacity is being offered in response to continued interest from potential shippers and is expected to be available in the first quarter of 2018.</p> <ul> <li><a href="http://phx.corporate-ir.net/phoenix.zhtml?c=80547&amp;p=irol-newsArticle&amp;ID=2033784">Enterprise Offering Additional Capacity on Aegis Ethane Pipeline System</a></li> </ul> <div style="clear:both; height: 0px; font-size: 1px"></div> <hr /> <table style="margin: 0 10px;"> <tr style="vertical-align:top; align:center"> <td style="padding: 10px; width: 100%;"> <p><strong>Related News</strong></p> <p><strong>Looking for information on the Pipeline sector?</strong></p> <ul> <li><a href="http://abarrelfull.wikidot.com/oil-and-gas-pipelines">Oil and Gas Pipelines</a></li> <li><a href="http://abarrelfull.wikidot.com/construction-and-engineering-companies-pipeline-references">Construction And Engineering Companies Pipeline References</a></li> </ul> </td> <td style="padding: 10px; width: 100%;"> <p><iframe src="https://www.flickr.com/photos/royaldutchshell/5135764786/in/set-72157625287640424/player/" width="240" height="160" frameborder="0" allowfullscreen="allowfullscreen" webkitallowfullscreen="" mozallowfullscreen="" oallowfullscreen="" msallowfullscreen=""></iframe></p> </td> </tr> </table> <p>by <span class="printuser avatarhover"><a href="http://www.wikidot.com/user:info/abarrelfull" ><img class="small" src="http://www.wikidot.com/avatar.php?userid=418097&amp;amp;size=small&amp;amp;timestamp=1787129926" alt="abarrelfull" style="background-image:url(http://www.wikidot.com/userkarma.php?u=418097)" /></a><a href="http://www.wikidot.com/user:info/abarrelfull" >abarrelfull</a></span></p> 
				 	]]>
				</content:encoded>							</item>
					<item>
				<guid>http://killajoules.wikidot.com/blog:5709</guid>
				<title>Enterprise to Move Forward with Panola NGL Pipeline Expansion after Successful Open Season</title>
				<link>http://killajoules.wikidot.com/blog:5709</link>
				<description>

&lt;p&gt;Enterprise Products Partners L.P. (NYSE:EPD) today announced that shipper commitments received during a recent binding commitment period will support its proposed expansion of the &lt;a href=&quot;http://abarrelfull.wikidot.com/panola-ngl-pipeline&quot;&gt;Panola Pipeline Company, LLC natural gas liquids (“NGL”) system&lt;/a&gt;. The 181-mile system originates near Carthage, Texas and extends to Mont Belvieu, Texas where it serves multiple destination points, including facilities owned and operated by Enterprise.&lt;/p&gt;
&lt;p&gt;by &lt;span class=&quot;printuser avatarhover&quot;&gt;&lt;a href=&quot;http://www.wikidot.com/user:info/abarrelfull&quot;  &gt;&lt;img class=&quot;small&quot; src=&quot;http://www.wikidot.com/avatar.php?userid=418097&amp;amp;amp;size=small&amp;amp;amp;timestamp=1787129926&quot; alt=&quot;abarrelfull&quot; style=&quot;background-image:url(http://www.wikidot.com/userkarma.php?u=418097)&quot; /&gt;&lt;/a&gt;&lt;a href=&quot;http://www.wikidot.com/user:info/abarrelfull&quot;  &gt;abarrelfull&lt;/a&gt;&lt;/span&gt;&lt;/p&gt;
</description>
				<pubDate>Mon, 26 Jan 2015 08:16:19 +0000</pubDate>
												<content:encoded>
					<![CDATA[
						 <p>Enterprise Products Partners L.P. (NYSE:EPD) today announced that shipper commitments received during a recent binding commitment period will support its proposed expansion of the <a href="http://abarrelfull.wikidot.com/panola-ngl-pipeline">Panola Pipeline Company, LLC natural gas liquids (“NGL”) system</a>. The 181-mile system originates near Carthage, Texas and extends to Mont Belvieu, Texas where it serves multiple destination points, including facilities owned and operated by Enterprise.</p> <p>As part of the expansion project, Enterprise plans to install 60 miles of new pipeline, as well as pumps and other related equipment designed to increase system capacity by 50,000 barrels per day. The incremental capacity is expected to be available in the first quarter of 2016.</p> <p>“For Haynesville and Cotton Valley producers, expansion of the Panola Pipeline will facilitate continued development of their reserves by providing valuable NGL takeaway capacity for their growing production of liquids-rich natural gas in East Texas and Northwest Louisiana,” said A.J. “Jim” Teague, chief operating officer of Enterprise’s general partner. “By providing a direct link to Mont Belvieu, the Panola Pipeline offers shippers not only flow assurance but market choices with access to the largest NGL fractionation and storage hub in the world, connections to the vast concentration of petrochemical facilities along the Gulf Coast and export opportunities.”</p> <ul> <li><a href="http://phx.corporate-ir.net/phoenix.zhtml?c=80547&amp;p=irol-newsArticle&amp;ID=2009732">Enterprise to Move Forward with Panola NGL Pipeline Expansion after Successful Open Season</a></li> </ul> <div style="clear:both; height: 0px; font-size: 1px"></div> <hr /> <table style="margin: 0 10px;"> <tr style="vertical-align:top; align:center"> <td style="padding: 10px; width: 100%;"> <p><strong>Related News</strong></p> <p><strong>Looking for information on the Pipeline sector?</strong></p> <ul> <li><a href="http://abarrelfull.wikidot.com/oil-and-gas-pipelines">Oil and Gas Pipelines</a></li> <li><a href="http://abarrelfull.wikidot.com/construction-and-engineering-companies-pipeline-references">Construction And Engineering Companies Pipeline References</a></li> </ul> </td> <td style="padding: 10px; width: 100%;"> <p><iframe src="https://www.flickr.com/photos/royaldutchshell/5135764786/in/set-72157625287640424/player/" width="240" height="160" frameborder="0" allowfullscreen="allowfullscreen" webkitallowfullscreen="" mozallowfullscreen="" oallowfullscreen="" msallowfullscreen=""></iframe></p> </td> </tr> </table> <p>by <span class="printuser avatarhover"><a href="http://www.wikidot.com/user:info/abarrelfull" ><img class="small" src="http://www.wikidot.com/avatar.php?userid=418097&amp;amp;size=small&amp;amp;timestamp=1787129926" alt="abarrelfull" style="background-image:url(http://www.wikidot.com/userkarma.php?u=418097)" /></a><a href="http://www.wikidot.com/user:info/abarrelfull" >abarrelfull</a></span></p> 
				 	]]>
				</content:encoded>							</item>
					<item>
				<guid>http://killajoules.wikidot.com/blog:5640</guid>
				<title>Enterprise Announces Results of Proposed Crude Oil Pipeline Open Season</title>
				<link>http://killajoules.wikidot.com/blog:5640</link>
				<description>

&lt;p&gt;Enterprise Products Partners L.P. (NYSE:EPD) today announced that the partnership has decided not to move forward with development of its proposed Bakken-to-Cushing crude oil pipeline. Commitments received from potential shippers during the recent open season were not sufficient to support the project.&lt;/p&gt;
&lt;p&gt;by &lt;span class=&quot;printuser avatarhover&quot;&gt;&lt;a href=&quot;http://www.wikidot.com/user:info/abarrelfull&quot;  &gt;&lt;img class=&quot;small&quot; src=&quot;http://www.wikidot.com/avatar.php?userid=418097&amp;amp;amp;size=small&amp;amp;amp;timestamp=1787129926&quot; alt=&quot;abarrelfull&quot; style=&quot;background-image:url(http://www.wikidot.com/userkarma.php?u=418097)&quot; /&gt;&lt;/a&gt;&lt;a href=&quot;http://www.wikidot.com/user:info/abarrelfull&quot;  &gt;abarrelfull&lt;/a&gt;&lt;/span&gt;&lt;/p&gt;
</description>
				<pubDate>Tue, 16 Dec 2014 08:07:12 +0000</pubDate>
												<content:encoded>
					<![CDATA[
						 <p>Enterprise Products Partners L.P. (NYSE:EPD) today announced that the partnership has decided not to move forward with development of its proposed Bakken-to-Cushing crude oil pipeline. Commitments received from potential shippers during the recent open season were not sufficient to support the project.</p> <ul> <li><a href="http://phx.corporate-ir.net/phoenix.zhtml?c=80547&amp;p=irol-newsArticle&amp;ID=1999159">Enterprise Announces Results of Proposed Crude Oil Pipeline Open Season</a></li> </ul> <div style="clear:both; height: 0px; font-size: 1px"></div> <hr /> <table style="margin: 0 10px;"> <tr style="vertical-align:top; align:center"> <td style="padding: 10px; width: 100%;"> <p><strong>Related News</strong></p> <p><strong>Looking for information on the Pipeline sector?</strong></p> <ul> <li><a href="http://abarrelfull.wikidot.com/oil-and-gas-pipelines">Oil and Gas Pipelines</a></li> <li><a href="http://abarrelfull.wikidot.com/construction-and-engineering-companies-pipeline-references">Construction And Engineering Companies Pipeline References</a></li> </ul> </td> <td style="padding: 10px; width: 100%;"> <p><iframe src="https://www.flickr.com/photos/royaldutchshell/5135764786/in/set-72157625287640424/player/" width="240" height="160" frameborder="0" allowfullscreen="allowfullscreen" webkitallowfullscreen="" mozallowfullscreen="" oallowfullscreen="" msallowfullscreen=""></iframe></p> </td> </tr> </table> <p>by <span class="printuser avatarhover"><a href="http://www.wikidot.com/user:info/abarrelfull" ><img class="small" src="http://www.wikidot.com/avatar.php?userid=418097&amp;amp;size=small&amp;amp;timestamp=1787129926" alt="abarrelfull" style="background-image:url(http://www.wikidot.com/userkarma.php?u=418097)" /></a><a href="http://www.wikidot.com/user:info/abarrelfull" >abarrelfull</a></span></p> 
				 	]]>
				</content:encoded>							</item>
					<item>
				<guid>http://killajoules.wikidot.com/blog:5575</guid>
				<title>Enterprise Products and Oiltanking Partners Announce Merger Agreement</title>
				<link>http://killajoules.wikidot.com/blog:5575</link>
				<description>

&lt;p&gt;Enterprise Products Partners L.P. (NYSE:EPD, “Enterprise”) and Oiltanking Partners, L.P. (NYSE:OILT, “Oiltanking Partners”) announced today that Enterprise and Oiltanking Partners have entered into a merger agreement. Under the terms of the merger agreement, Oiltanking Partners would merge with a subsidiary of Enterprise in a unit-for-unit exchange. Unitholders of Oiltanking Partners (other than Enterprise and its subsidiaries) would receive 1.3 Enterprise common units for each Oiltanking Partners common unit. This exchange ratio represents a 5.6 percent premium to Oiltanking Partners unitholders based on the respective closing prices for Enterprise and Oiltanking Partners common units on September 30, 2014, the day before the merger was originally proposed. Relative to the respective closing prices for Enterprise and Oiltanking Partners common units on November 10, 2014, the day before the parties entered into the merger agreement, the 1.3 exchange ratio represents a 10.4 percent premium to Oiltanking Partners unitholders. Based on the latest cash distribution declared by Enterprise and Oiltanking Partners with respect to the third quarter of 2014, this exchange ratio would result in a 74 percent increase in cash distributions for Oiltanking Partners unitholders.&lt;/p&gt;
&lt;p&gt;by &lt;span class=&quot;printuser avatarhover&quot;&gt;&lt;a href=&quot;http://www.wikidot.com/user:info/abarrelfull&quot;  &gt;&lt;img class=&quot;small&quot; src=&quot;http://www.wikidot.com/avatar.php?userid=418097&amp;amp;amp;size=small&amp;amp;amp;timestamp=1787129926&quot; alt=&quot;abarrelfull&quot; style=&quot;background-image:url(http://www.wikidot.com/userkarma.php?u=418097)&quot; /&gt;&lt;/a&gt;&lt;a href=&quot;http://www.wikidot.com/user:info/abarrelfull&quot;  &gt;abarrelfull&lt;/a&gt;&lt;/span&gt;&lt;/p&gt;
</description>
				<pubDate>Fri, 14 Nov 2014 06:46:51 +0000</pubDate>
												<content:encoded>
					<![CDATA[
						 <p>Enterprise Products Partners L.P. (NYSE:EPD, “Enterprise”) and Oiltanking Partners, L.P. (NYSE:OILT, “Oiltanking Partners”) announced today that Enterprise and Oiltanking Partners have entered into a merger agreement. Under the terms of the merger agreement, Oiltanking Partners would merge with a subsidiary of Enterprise in a unit-for-unit exchange. Unitholders of Oiltanking Partners (other than Enterprise and its subsidiaries) would receive 1.3 Enterprise common units for each Oiltanking Partners common unit. This exchange ratio represents a 5.6 percent premium to Oiltanking Partners unitholders based on the respective closing prices for Enterprise and Oiltanking Partners common units on September 30, 2014, the day before the merger was originally proposed. Relative to the respective closing prices for Enterprise and Oiltanking Partners common units on November 10, 2014, the day before the parties entered into the merger agreement, the 1.3 exchange ratio represents a 10.4 percent premium to Oiltanking Partners unitholders. Based on the latest cash distribution declared by Enterprise and Oiltanking Partners with respect to the third quarter of 2014, this exchange ratio would result in a 74 percent increase in cash distributions for Oiltanking Partners unitholders.</p> <p>The approval and adoption of the merger agreement require approval by holders of a majority of the outstanding Oiltanking Partners common units. A subsidiary of Enterprise, which will own a sufficient number of Oiltanking Partners common units to approve the merger on behalf of all Oiltanking Partners unitholders, has executed a support agreement with Oiltanking Partners in which it has irrevocably agreed to consent to the merger. This subsidiary will own approximately 54.8 million Oiltanking Partners common units, or approximately 66 percent of the total Oiltanking Partners common units then outstanding, following the conversion of approximately 38.9 million Oiltanking Partners subordinated units into common units. The one-for-one conversion of these subordinated units into common units will occur on November 17, 2014, the business day immediately following payment of the Oiltanking Partners cash distribution scheduled to be paid on November 14, 2014. Approval and adoption of the merger agreement will be submitted to a vote of the unitholders of Oiltanking Partners.</p> <p>“We are pleased to announce the execution of this merger agreement that would result in the merger of Oiltanking Partners into Enterprise,” said Michael A. Creel, chief executive officer of the general partner of Enterprise. “The combination of Enterprise’s system of midstream assets and Oiltanking Partners’ access to waterborne markets and crude oil and petroleum products storage assets would extend and broaden Enterprise’s midstream energy services business. Upon completion of the merger, Oiltanking Partners unitholders would benefit from Enterprise’s scale, diversification and financial flexibility; visibility to growth driven by over $6 billion of capital projects under construction; a significant increase in cash distributions; and more daily liquidity from ownership of Enterprise common units.”</p> <p>On October 1, 2014, Enterprise announced that it had acquired the general partner and related incentive distribution rights, 15,899,802 common units and 38,899,802 subordinated units in Oiltanking Partners held by Oiltanking Holding Americas, Inc. (“Oiltanking Holding”). Enterprise paid total consideration of approximately $4.41 billion to Oiltanking Holding comprised of $2.21 billion in cash and 54,807,352 Enterprise common units. Enterprise also paid $228 million to assume notes receivable issued by Oiltanking Partners and its subsidiaries. Enterprise also announced that it had submitted a proposal to the conflicts committee of the general partner of Oiltanking Partners to merge Oiltanking Partners with and into Enterprise. Under the terms of the proposal, Enterprise would have exchanged 1.23 Enterprise common units for each Oiltanking Partners common unit. The exchange ratio of 1.3 Enterprise common units for each Oiltanking Partners common unit represents a 5.7 percent increase compared to the exchange ratio in the earlier proposal.</p> <p>Upon completion of the merger, which is expected to occur in early 2015, the total consideration paid by Enterprise for the Oiltanking Partners general partner and related incentive distribution rights and the limited partner units would be approximately $6.0 billion.</p> <p>The merger terms were negotiated, reviewed and approved by the conflicts committee of the board of directors of the general partner of Oiltanking Partners and approved by the board of directors of the general partner of Oiltanking Partners. The Oiltanking Partners conflicts committee is comprised of the independent members of the board of directors of Oiltanking Partners’ general partner. As part of their evaluation process, the Oiltanking Partners conflicts committee retained Jefferies LLC as its financial advisor, Latham &amp; Watkins LLP as its legal advisor and Richards, Layton &amp; Finger, P.A. as its special Delaware legal advisor. Vinson &amp; Elkins L.L.P. also acted as special legal counsel to Oiltanking Partners.</p> <p>Citi acted as financial advisor and Andrews Kurth LLP and Akin Gump Strauss Hauer &amp; Feld LLP acted as legal counsel to Enterprise.</p> <p>The closing of the merger is subject to customary closing conditions, including effectiveness of a registration statement related to the issuance of new Enterprise common units to Oiltanking Partners’ unitholders.</p> <ul> <li><a href="http://phx.corporate-ir.net/phoenix.zhtml?c=80547&amp;p=irol-newsArticle&amp;ID=1988797">Enterprise Products and Oiltanking Partners Announce Merger Agreement</a></li> </ul> <div style="clear:both; height: 0px; font-size: 1px"></div> <hr /> <table style="margin: 0 10px;"> <tr style="vertical-align:top; align:center"> <td style="padding: 10px; width: 100%;"> <p><strong>Related News</strong></p> <p><strong>Looking for information on the Pipeline sector?</strong></p> <ul> <li><a href="http://abarrelfull.wikidot.com/oil-and-gas-pipelines">Oil and Gas Pipelines</a></li> <li><a href="http://abarrelfull.wikidot.com/construction-and-engineering-companies-pipeline-references">Construction And Engineering Companies Pipeline References</a></li> </ul> </td> <td style="padding: 10px; width: 100%;"> <p><iframe src="https://www.flickr.com/photos/royaldutchshell/5135764786/in/set-72157625287640424/player/" width="240" height="160" frameborder="0" allowfullscreen="allowfullscreen" webkitallowfullscreen="" mozallowfullscreen="" oallowfullscreen="" msallowfullscreen=""></iframe></p> </td> </tr> </table> <p>by <span class="printuser avatarhover"><a href="http://www.wikidot.com/user:info/abarrelfull" ><img class="small" src="http://www.wikidot.com/avatar.php?userid=418097&amp;amp;size=small&amp;amp;timestamp=1787129926" alt="abarrelfull" style="background-image:url(http://www.wikidot.com/userkarma.php?u=418097)" /></a><a href="http://www.wikidot.com/user:info/abarrelfull" >abarrelfull</a></span></p> 
				 	]]>
				</content:encoded>							</item>
					<item>
				<guid>http://killajoules.wikidot.com/blog:5552</guid>
				<title>Plains All American and Enterprise Products Announce Eagle Ford Joint Venture Pipeline Expansions, New Terminal</title>
				<link>http://killajoules.wikidot.com/blog:5552</link>
				<description>

&lt;p&gt;Plains All American Pipeline, L.P. (NYSE: PAA) and Enterprise Products Partners L.P. (NYSE: EPD) today announced that they are constructing a new condensate gathering system into their Three Rivers terminal and doubling the mainline capacity on the &lt;a href=&quot;http://abarrelfull.wikidot.com/eagle-ford-jv-pipeline-system&quot;&gt;Eagle Ford Joint Venture (JV) Pipeline&lt;/a&gt; from Three Rivers to Corpus Christi. These expansions are supported by a long-term production commitment and are expected to be placed into service in the third quarter of 2015.&lt;/p&gt;
&lt;p&gt;by &lt;span class=&quot;printuser avatarhover&quot;&gt;&lt;a href=&quot;http://www.wikidot.com/user:info/abarrelfull&quot;  &gt;&lt;img class=&quot;small&quot; src=&quot;http://www.wikidot.com/avatar.php?userid=418097&amp;amp;amp;size=small&amp;amp;amp;timestamp=1787129926&quot; alt=&quot;abarrelfull&quot; style=&quot;background-image:url(http://www.wikidot.com/userkarma.php?u=418097)&quot; /&gt;&lt;/a&gt;&lt;a href=&quot;http://www.wikidot.com/user:info/abarrelfull&quot;  &gt;abarrelfull&lt;/a&gt;&lt;/span&gt;&lt;/p&gt;
</description>
				<pubDate>Wed, 05 Nov 2014 06:41:44 +0000</pubDate>
												<content:encoded>
					<![CDATA[
						 <p>Plains All American Pipeline, L.P. (NYSE: PAA) and Enterprise Products Partners L.P. (NYSE: EPD) today announced that they are constructing a new condensate gathering system into their Three Rivers terminal and doubling the mainline capacity on the <a href="http://abarrelfull.wikidot.com/eagle-ford-jv-pipeline-system">Eagle Ford Joint Venture (JV) Pipeline</a> from Three Rivers to Corpus Christi. These expansions are supported by a long-term production commitment and are expected to be placed into service in the third quarter of 2015.</p> <p>The Eagle Ford JV Pipeline system is a 50/50 joint venture between Plains and Enterprise that delivers crude oil and condensate via pipeline from Gardendale in La Salle County, Texas to the Three Rivers and Corpus Christi refineries and to other markets via marine transport facilities at Corpus Christi. Furthermore, the pipeline supplies the Houston-area market through a connection to the Enterprise Crude Pipeline terminal at Lyssy in Wilson County, Texas.</p> <p>As part of the expansion, Plains and Enterprise will construct a new gathering system with approximately 55 miles of gathering and trunkline pipeline that will connect Karnes County and Live Oak County production areas to the Three Rivers terminal. The companies will also construct an additional 70 mile, 20-inch pipeline from Three Rivers to Corpus Christi as well as expand storage and pumping capacity at Three Rivers. Combined with the previously announced expansion, this project effectively loops the Eagle Ford JV Pipeline from Gardendale to Corpus Christi and increases the JV system capacity to over 600,000 barrels per day. The Eagle Ford JV Pipeline will be connected with the Cactus pipeline, which Plains is constructing from the Permian Basin at McCamey to the Eagle Ford JV Pipeline at Gardendale.</p> <p>Plains and Enterprise will also build a new terminal on the Corpus Christi ship channel to support the increased volumes to be shipped via pipeline to the region. The dock will have the capacity to handle a variety of ocean-going vessels and is planned to be in service by 2017.</p> <ul> <li><a href="http://phx.corporate-ir.net/phoenix.zhtml?c=80547&amp;p=irol-newsArticle&amp;ID=1985310">Plains All American and Enterprise Products Announce Eagle Ford Joint Venture Pipeline Expansions, New Terminal</a></li> </ul> <div style="clear:both; height: 0px; font-size: 1px"></div> <hr /> <table style="margin: 0 10px;"> <tr style="vertical-align:top; align:center"> <td style="padding: 10px; width: 100%;"> <p><strong>Related News</strong></p> <p><strong>Looking for information on the Pipeline sector?</strong></p> <ul> <li><a href="http://abarrelfull.wikidot.com/oil-and-gas-pipelines">Oil and Gas Pipelines</a></li> <li><a href="http://abarrelfull.wikidot.com/construction-and-engineering-companies-pipeline-references">Construction And Engineering Companies Pipeline References</a></li> </ul> </td> <td style="padding: 10px; width: 100%;"> <p><iframe src="https://www.flickr.com/photos/royaldutchshell/5135764786/in/set-72157625287640424/player/" width="240" height="160" frameborder="0" allowfullscreen="allowfullscreen" webkitallowfullscreen="" mozallowfullscreen="" oallowfullscreen="" msallowfullscreen=""></iframe></p> </td> </tr> </table> <p>by <span class="printuser avatarhover"><a href="http://www.wikidot.com/user:info/abarrelfull" ><img class="small" src="http://www.wikidot.com/avatar.php?userid=418097&amp;amp;size=small&amp;amp;timestamp=1787129926" alt="abarrelfull" style="background-image:url(http://www.wikidot.com/userkarma.php?u=418097)" /></a><a href="http://www.wikidot.com/user:info/abarrelfull" >abarrelfull</a></span></p> 
				 	]]>
				</content:encoded>							</item>
					<item>
				<guid>http://killajoules.wikidot.com/blog:5471</guid>
				<title>Enterprise to Build Natural Gas Processing Facility and Pipelines to Serve Delaware Basin</title>
				<link>http://killajoules.wikidot.com/blog:5471</link>
				<description>

&lt;p&gt;Enterprise Products Partners L.P. (NYSE:EPD) today announced plans to construct a new cryogenic natural gas processing plant in Eddy County, New Mexico and associated natural gas and natural gas liquid (“NGL”) pipeline infrastructure to facilitate growing production of NGL-rich natural gas in the Delaware Basin. These assets are expected to begin operations in the first quarter of 2016.&lt;/p&gt;
&lt;p&gt;by &lt;span class=&quot;printuser avatarhover&quot;&gt;&lt;a href=&quot;http://www.wikidot.com/user:info/abarrelfull&quot;  &gt;&lt;img class=&quot;small&quot; src=&quot;http://www.wikidot.com/avatar.php?userid=418097&amp;amp;amp;size=small&amp;amp;amp;timestamp=1787129926&quot; alt=&quot;abarrelfull&quot; style=&quot;background-image:url(http://www.wikidot.com/userkarma.php?u=418097)&quot; /&gt;&lt;/a&gt;&lt;a href=&quot;http://www.wikidot.com/user:info/abarrelfull&quot;  &gt;abarrelfull&lt;/a&gt;&lt;/span&gt;&lt;/p&gt;
</description>
				<pubDate>Thu, 02 Oct 2014 12:23:41 +0000</pubDate>
												<content:encoded>
					<![CDATA[
						 <p>Enterprise Products Partners L.P. (NYSE:EPD) today announced plans to construct a new cryogenic natural gas processing plant in Eddy County, New Mexico and associated natural gas and natural gas liquid (“NGL”) pipeline infrastructure to facilitate growing production of NGL-rich natural gas in the Delaware Basin. These assets are expected to begin operations in the first quarter of 2016.</p> <p>The South Eddy natural gas processing plant will have an initial capacity of 200 million cubic feet per day (“MMcf/d”) of natural gas, with the potential for future expansions. Upon completion, this will bring Enterprise’s total natural gas processing plant capacity in the Delaware Basin to 400 MMcf/d.</p> <p>To supply the new plant, Enterprise plans to construct approximately 80 miles of natural gas gathering pipelines to complement its existing 1,500 miles of natural gas pipelines located in the Delaware Basin. Enterprise will also build a 75-mile, 12-inch diameter NGL pipeline to transport NGLs from the South Eddy plant to the company’s Hobbs NGL fractionation and storage facility in Gaines County, Texas. Through the connection at Hobbs, customers will have access to Enterprise’s integrated network of pipelines linking them to the company’s NGL fractionation and storage complex in Mont Belvieu, Texas. Additionally, Enterprise plans to construct pipelines to deliver residue gas from the South Eddy plant to multiple third party pipelines.</p> <p>“With multiple production zones providing years of drilling opportunities and the rig count in the region rising, the Delaware Basin is expecting to see NGL-rich natural gas production continue to expand significantly,” said A.J. “Jim” Teague, chief operating officer of Enterprise’s general partner. “Volumes into our existing facilities in the region have doubled since 2012 and existing infrastructure is operating at capacity. As a result, our customers are looking for a solution that will allow them to increase and fully maximize the value of their production. The addition of this new cryogenic natural gas processing facility to our integrated midstream network provides producers in this prolific region improved flow assurance and additional market choices, including access to expanding petrochemical facilities and export opportunities along the Gulf Coast.”</p> <ul> <li><a href="http://phx.corporate-ir.net/phoenix.zhtml?c=80547&amp;p=irol-newsArticle&amp;ID=1972211&amp;highlight=">Enterprise to Build Natural Gas Processing Facility and Pipelines to Serve Delaware Basin</a></li> </ul> <div style="clear:both; height: 0px; font-size: 1px"></div> <hr /> <table style="margin: 0 10px;"> <tr style="vertical-align:top; align:center"> <td style="padding: 10px; width: 100%;"> <p><strong>Related News</strong></p> <p><strong>Looking for information on the Pipeline sector?</strong></p> <ul> <li><a href="http://abarrelfull.wikidot.com/oil-and-gas-pipelines">Oil and Gas Pipelines</a></li> <li><a href="http://abarrelfull.wikidot.com/construction-and-engineering-companies-pipeline-references">Construction And Engineering Companies Pipeline References</a></li> </ul> </td> <td style="padding: 10px; width: 100%;"> <p><iframe src="https://www.flickr.com/photos/royaldutchshell/5135764786/in/set-72157625287640424/player/" width="240" height="160" frameborder="0" allowfullscreen="allowfullscreen" webkitallowfullscreen="" mozallowfullscreen="" oallowfullscreen="" msallowfullscreen=""></iframe></p> </td> </tr> </table> <p>by <span class="printuser avatarhover"><a href="http://www.wikidot.com/user:info/abarrelfull" ><img class="small" src="http://www.wikidot.com/avatar.php?userid=418097&amp;amp;size=small&amp;amp;timestamp=1787129926" alt="abarrelfull" style="background-image:url(http://www.wikidot.com/userkarma.php?u=418097)" /></a><a href="http://www.wikidot.com/user:info/abarrelfull" >abarrelfull</a></span></p> 
				 	]]>
				</content:encoded>							</item>
					<item>
				<guid>http://killajoules.wikidot.com/blog:5416</guid>
				<title>Enterprise to Hold Open Season for Proposed Bakken-to-Cushing Crude Oil Pipeline</title>
				<link>http://killajoules.wikidot.com/blog:5416</link>
				<description>

&lt;p&gt;Enterprise Products Partners L.P. (NYSE:EPD) today announced the start of a binding open commitment period to determine shipper demand for capacity on a proposed new pipeline that would originate in the Williston Basin of North Dakota and also serve the Powder River and Denver-Julesburg (“DJ”) Basins. The 30-inch diameter pipeline would extend approximately 1,200 miles to the Cushing hub in Oklahoma and is currently designed to have an initial capacity of approximately 340,000 barrels per day (“BPD”) of crude oil, expandable to more than 700,000 BPD.&lt;/p&gt;
&lt;p&gt;by &lt;span class=&quot;printuser avatarhover&quot;&gt;&lt;a href=&quot;http://www.wikidot.com/user:info/abarrelfull&quot;  &gt;&lt;img class=&quot;small&quot; src=&quot;http://www.wikidot.com/avatar.php?userid=418097&amp;amp;amp;size=small&amp;amp;amp;timestamp=1787129926&quot; alt=&quot;abarrelfull&quot; style=&quot;background-image:url(http://www.wikidot.com/userkarma.php?u=418097)&quot; /&gt;&lt;/a&gt;&lt;a href=&quot;http://www.wikidot.com/user:info/abarrelfull&quot;  &gt;abarrelfull&lt;/a&gt;&lt;/span&gt;&lt;/p&gt;
</description>
				<pubDate>Fri, 05 Sep 2014 12:47:41 +0000</pubDate>
												<content:encoded>
					<![CDATA[
						 <p>Enterprise Products Partners L.P. (NYSE:EPD) today announced the start of a binding open commitment period to determine shipper demand for capacity on a proposed new pipeline that would originate in the Williston Basin of North Dakota and also serve the Powder River and Denver-Julesburg (“DJ”) Basins. The 30-inch diameter pipeline would extend approximately 1,200 miles to the Cushing hub in Oklahoma and is currently designed to have an initial capacity of approximately 340,000 barrels per day (“BPD”) of crude oil, expandable to more than 700,000 BPD.</p> <p>The <a href="http://abarrelfull.wikidot.com/bakken-to-cushing-crude-oil-pipeline">Bakken-to-Cushing pipeline</a> would have the capability to transport up to six grades of crude oil and products, including Rockies Condensate and Processed Condensate. Subject to sufficient customer commitments, the pipeline is expected to begin service in stages, starting with the DJ-to-Cushing portion in the fourth quarter of 2016, and should be fully operational by the third quarter of 2017.</p> <p>“This pipeline offers a reliable, safe, and economical solution that promotes continued development of some of our nation’s most prolific producing areas and reduces the need for imports of crude oil,” said A.J. “Jim” Teague, executive vice president and chief operating officer of Enterprise’s general partner. “By leveraging the capabilities of our existing midstream network, the Bakken-to-Cushing pipeline would provide flow assurance and market choice. At Cushing, shippers would have access to one of the most liquid crude oil trading hubs in the world, as well as a comprehensive network of storage and pipelines serving the U.S. Gulf Coast refining complex and waterborne transportation options.”</p> <ul> <li><a href="http://phx.corporate-ir.net/phoenix.zhtml?c=80547&amp;p=irol-newsArticle&amp;ID=1964135&amp;highlight=">Enterprise to Hold Open Season for Proposed Bakken-to-Cushing Crude Oil Pipeline</a></li> </ul> <div style="clear:both; height: 0px; font-size: 1px"></div> <hr /> <table style="margin: 0 10px;"> <tr style="vertical-align:top; align:center"> <td style="padding: 10px; width: 100%;"> <p><strong>Related News</strong></p> <p><strong>Looking for information on the Pipeline sector?</strong></p> <ul> <li><a href="http://abarrelfull.wikidot.com/oil-and-gas-pipelines">Oil and Gas Pipelines</a></li> <li><a href="http://abarrelfull.wikidot.com/construction-and-engineering-companies-pipeline-references">Construction And Engineering Companies Pipeline References</a></li> </ul> </td> <td style="padding: 10px; width: 100%;"> <p><iframe src="https://www.flickr.com/photos/royaldutchshell/5135764786/in/set-72157625287640424/player/" width="240" height="160" frameborder="0" allowfullscreen="allowfullscreen" webkitallowfullscreen="" mozallowfullscreen="" oallowfullscreen="" msallowfullscreen=""></iframe></p> </td> </tr> </table> <p>by <span class="printuser avatarhover"><a href="http://www.wikidot.com/user:info/abarrelfull" ><img class="small" src="http://www.wikidot.com/avatar.php?userid=418097&amp;amp;size=small&amp;amp;timestamp=1787129926" alt="abarrelfull" style="background-image:url(http://www.wikidot.com/userkarma.php?u=418097)" /></a><a href="http://www.wikidot.com/user:info/abarrelfull" >abarrelfull</a></span></p> 
				 	]]>
				</content:encoded>							</item>
					<item>
				<guid>http://killajoules.wikidot.com/blog:5349</guid>
				<title>Enterprise and Genesis Complete Crude Oil Pipeline in the Deepwater Gulf of Mexico</title>
				<link>http://killajoules.wikidot.com/blog:5349</link>
				<description>

&lt;p&gt;Enterprise Products Partners L.P. (NYSE:EPD) and Genesis Energy, L.P. (NYSE: GEL) today announced that their jointly owned crude oil gathering pipeline serving the Lucius production area in southern Keathley Canyon is now mechanically complete and began earning revenues July 1, 2014. Constructed and owned by &lt;a href=&quot;http://abarrelfull.wikidot.com/sekco-oil-pipeline&quot;&gt;Southeast Keathley Canyon Pipeline Company, L.L.C. (“SEKCO”)&lt;/a&gt;, a 50/50 joint venture between Enterprise and Genesis, the 149-mile, 18-inch diameter pipeline connects the third party-owned Lucius-truss spar floating production platform to an existing junction platform at South Marsh Island 205, which is part of the Enterprise-operated Poseidon pipeline system. Enterprise serves as operator of the SEKCO pipeline, which has a capacity of 115,000 barrels per day.&lt;/p&gt;
&lt;p&gt;by &lt;span class=&quot;printuser avatarhover&quot;&gt;&lt;a href=&quot;http://www.wikidot.com/user:info/abarrelfull&quot;  &gt;&lt;img class=&quot;small&quot; src=&quot;http://www.wikidot.com/avatar.php?userid=418097&amp;amp;amp;size=small&amp;amp;amp;timestamp=1787129926&quot; alt=&quot;abarrelfull&quot; style=&quot;background-image:url(http://www.wikidot.com/userkarma.php?u=418097)&quot; /&gt;&lt;/a&gt;&lt;a href=&quot;http://www.wikidot.com/user:info/abarrelfull&quot;  &gt;abarrelfull&lt;/a&gt;&lt;/span&gt;&lt;/p&gt;
</description>
				<pubDate>Mon, 11 Aug 2014 05:17:39 +0000</pubDate>
												<content:encoded>
					<![CDATA[
						 <p>Enterprise Products Partners L.P. (NYSE:EPD) and Genesis Energy, L.P. (NYSE: GEL) today announced that their jointly owned crude oil gathering pipeline serving the Lucius production area in southern Keathley Canyon is now mechanically complete and began earning revenues July 1, 2014. Constructed and owned by <a href="http://abarrelfull.wikidot.com/sekco-oil-pipeline">Southeast Keathley Canyon Pipeline Company, L.L.C. (“SEKCO”)</a>, a 50/50 joint venture between Enterprise and Genesis, the 149-mile, 18-inch diameter pipeline connects the third party-owned Lucius-truss spar floating production platform to an existing junction platform at South Marsh Island 205, which is part of the Enterprise-operated Poseidon pipeline system. Enterprise serves as operator of the SEKCO pipeline, which has a capacity of 115,000 barrels per day.</p> <p>A producer group, led by operator Anadarko Petroleum Corporation, is developing the Lucius production area, which is estimated to have resources of more than 300 million barrels of oil equivalent. First production is expected during the second half of 2014.</p> <ul> <li><a href="http://phx.corporate-ir.net/phoenix.zhtml?c=80547&amp;p=irol-newsArticle&amp;ID=1953238&amp;highlight=">Enterprise and Genesis Complete Crude Oil Pipeline in the Deepwater Gulf of Mexico</a></li> </ul> <p>by <span class="printuser avatarhover"><a href="http://www.wikidot.com/user:info/abarrelfull" ><img class="small" src="http://www.wikidot.com/avatar.php?userid=418097&amp;amp;size=small&amp;amp;timestamp=1787129926" alt="abarrelfull" style="background-image:url(http://www.wikidot.com/userkarma.php?u=418097)" /></a><a href="http://www.wikidot.com/user:info/abarrelfull" >abarrelfull</a></span></p> 
				 	]]>
				</content:encoded>							</item>
					<item>
				<guid>http://killajoules.wikidot.com/blog:5304</guid>
				<title>Construction of Seaway Crude Oil Pipeline Loop (Twin) Completed</title>
				<link>http://killajoules.wikidot.com/blog:5304</link>
				<description>

&lt;p&gt;Enterprise Products Partners L.P. (NYSE:EPD) and Enbridge Inc. (TSX:ENB)(NYSE:ENB) announced today that the 512-mile &lt;a href=&quot;http://abarrelfull.wikidot.com/seaway-crude-oil-pipeline&quot;&gt;Seaway Pipeline system&lt;/a&gt; loop (twin) pipeline from Cushing, Oklahoma, to the Jones Creek storage and terminal facility near Freeport, Texas, is mechanically complete. The new 30-inch Seaway Loop (Twin) Pipeline is expected to more than double the capacity of the Seaway system to 850,000 BPD.&lt;/p&gt;
&lt;p&gt;by &lt;span class=&quot;printuser avatarhover&quot;&gt;&lt;a href=&quot;http://www.wikidot.com/user:info/abarrelfull&quot;  &gt;&lt;img class=&quot;small&quot; src=&quot;http://www.wikidot.com/avatar.php?userid=418097&amp;amp;amp;size=small&amp;amp;amp;timestamp=1787129926&quot; alt=&quot;abarrelfull&quot; style=&quot;background-image:url(http://www.wikidot.com/userkarma.php?u=418097)&quot; /&gt;&lt;/a&gt;&lt;a href=&quot;http://www.wikidot.com/user:info/abarrelfull&quot;  &gt;abarrelfull&lt;/a&gt;&lt;/span&gt;&lt;/p&gt;
</description>
				<pubDate>Mon, 07 Jul 2014 12:35:07 +0000</pubDate>
												<content:encoded>
					<![CDATA[
						 <p>Enterprise Products Partners L.P. (NYSE:EPD) and Enbridge Inc. (TSX:ENB)(NYSE:ENB) announced today that the 512-mile <a href="http://abarrelfull.wikidot.com/seaway-crude-oil-pipeline">Seaway Pipeline system</a> loop (twin) pipeline from Cushing, Oklahoma, to the Jones Creek storage and terminal facility near Freeport, Texas, is mechanically complete. The new 30-inch Seaway Loop (Twin) Pipeline is expected to more than double the capacity of the Seaway system to 850,000 BPD.</p> <p>The Jones Creek facility is connected to Enterprise's ECHO crude oil storage facility in Houston by a 65-mile, 36-inch pipeline. Construction of a 100-mile, 30-inch pipeline from ECHO to Beaumont / Port Arthur, Texas, is expected to be completed in July 2014. Commissioning of the Seaway Loop (Twin), as well as the new pipeline from ECHO to Beaumont/Port Arthur, will continue throughout the third quarter 2014.</p> <p>In addition to the pipeline that transports crude oil from Cushing to the Gulf Coast, the Seaway system comprises a terminal and distribution network originating in Texas City, Texas, which serves refineries locally and in the Houston area. The Seaway system also includes dock facilities at Freeport and Texas City.</p> <ul> <li><a href="http://www.enbridge.com/MediaCentre/News.aspx?yearTab=en2014&amp;id=1856073">Construction of Seaway Crude Oil Pipeline Loop (Twin) Completed</a></li> </ul> <p>by <span class="printuser avatarhover"><a href="http://www.wikidot.com/user:info/abarrelfull" ><img class="small" src="http://www.wikidot.com/avatar.php?userid=418097&amp;amp;size=small&amp;amp;timestamp=1787129926" alt="abarrelfull" style="background-image:url(http://www.wikidot.com/userkarma.php?u=418097)" /></a><a href="http://www.wikidot.com/user:info/abarrelfull" >abarrelfull</a></span></p> 
				 	]]>
				</content:encoded>							</item>
					<item>
				<guid>http://killajoules.wikidot.com/blog:5245</guid>
				<title>Enterprise to Locate Ethane Export Terminal on the Houston Ship Channel</title>
				<link>http://killajoules.wikidot.com/blog:5245</link>
				<description>

&lt;p&gt;Enterprise Products Partners L.P. (NYSE: EPD) announced today that it will build its recently announced ethane export facility on the Houston Ship Channel. Enterprise has signed a 30-year agreement with the Port of Houston Authority for use of facilities adjacent to the partnership’s existing Morgan’s Point terminal.&lt;/p&gt;
&lt;p&gt;by &lt;span class=&quot;printuser avatarhover&quot;&gt;&lt;a href=&quot;http://www.wikidot.com/user:info/abarrelfull&quot;  &gt;&lt;img class=&quot;small&quot; src=&quot;http://www.wikidot.com/avatar.php?userid=418097&amp;amp;amp;size=small&amp;amp;amp;timestamp=1787129926&quot; alt=&quot;abarrelfull&quot; style=&quot;background-image:url(http://www.wikidot.com/userkarma.php?u=418097)&quot; /&gt;&lt;/a&gt;&lt;a href=&quot;http://www.wikidot.com/user:info/abarrelfull&quot;  &gt;abarrelfull&lt;/a&gt;&lt;/span&gt;&lt;/p&gt;
</description>
				<pubDate>Fri, 13 Jun 2014 09:17:44 +0000</pubDate>
												<content:encoded>
					<![CDATA[
						 <p>Enterprise Products Partners L.P. (NYSE: EPD) announced today that it will build its recently announced ethane export facility on the Houston Ship Channel. Enterprise has signed a 30-year agreement with the Port of Houston Authority for use of facilities adjacent to the partnership’s existing Morgan’s Point terminal.</p> <p>Enterprise also plans to construct a pipeline from its <a href="http://abarrelfull.wikidot.com/mont-belvieu-gas-processing-plants">Mont Belvieu</a>, Texas natural gas liquids fractionation and storage complex, providing direct access to ethane supply. As designed, the export terminal will have the capability to load fully refrigerated ethane at approximately 10,000 barrels per hour.</p> <p>The facility is expected to begin operations in the third quarter of 2016. Enterprise has long-term contracts in place to support the terminal and is in discussions with other potential customers for the remaining capacity.</p> <ul> <li><a href="http://phx.corporate-ir.net/phoenix.zhtml?c=80547&amp;p=irol-newsArticle&amp;ID=1939229&amp;highlight=">Enterprise to Locate Ethane Export Terminal on the Houston Ship Channel</a></li> </ul> <p>by <span class="printuser avatarhover"><a href="http://www.wikidot.com/user:info/abarrelfull" ><img class="small" src="http://www.wikidot.com/avatar.php?userid=418097&amp;amp;size=small&amp;amp;timestamp=1787129926" alt="abarrelfull" style="background-image:url(http://www.wikidot.com/userkarma.php?u=418097)" /></a><a href="http://www.wikidot.com/user:info/abarrelfull" >abarrelfull</a></span></p> 
				 	]]>
				</content:encoded>							</item>
					<item>
				<guid>http://killajoules.wikidot.com/blog:5119</guid>
				<title>Enterprise Products to Build Ethane Export Facility on Texas Gulf Coast</title>
				<link>http://killajoules.wikidot.com/blog:5119</link>
				<description>

&lt;p&gt;Enterprise Products Partners L.P. (NYSE: EPD) announced today that it plans to build a fully refrigerated ethane export facility on the Texas Gulf Coast. Enterprise has executed long-term contracts to support the development of the facility, which is designed to have an aggregate loading rate of approximately 10,000 barrels per hour, or up to 240 thousand barrels per day (“MBPD”). The export facility is expected to begin operations in the third quarter of 2016.&lt;/p&gt;
&lt;p&gt;by &lt;span class=&quot;printuser avatarhover&quot;&gt;&lt;a href=&quot;http://www.wikidot.com/user:info/abarrelfull&quot;  &gt;&lt;img class=&quot;small&quot; src=&quot;http://www.wikidot.com/avatar.php?userid=418097&amp;amp;amp;size=small&amp;amp;amp;timestamp=1787129926&quot; alt=&quot;abarrelfull&quot; style=&quot;background-image:url(http://www.wikidot.com/userkarma.php?u=418097)&quot; /&gt;&lt;/a&gt;&lt;a href=&quot;http://www.wikidot.com/user:info/abarrelfull&quot;  &gt;abarrelfull&lt;/a&gt;&lt;/span&gt;&lt;/p&gt;
</description>
				<pubDate>Fri, 25 Apr 2014 10:46:13 +0000</pubDate>
												<content:encoded>
					<![CDATA[
						 <p>Enterprise Products Partners L.P. (NYSE: EPD) announced today that it plans to build a fully refrigerated ethane export facility on the Texas Gulf Coast. Enterprise has executed long-term contracts to support the development of the facility, which is designed to have an aggregate loading rate of approximately 10,000 barrels per hour, or up to 240 thousand barrels per day (“MBPD”). The export facility is expected to begin operations in the third quarter of 2016.</p> <p>“We are pleased to announce the successful development of our fully refrigerated ethane export facility, which will be the largest in the world,” said Michael A. Creel, chief executive officer of Enterprise’s general partner. “We continue to receive strong interest from the international community for this project and are having ongoing discussions with other potential customers that could result in our contracting the remaining capacity of the facility.”</p> <p>“This facility is another example of Enterprise serving incremental market demand for growing supplies of U.S. energy. This is particularly important for ethane, which is a byproduct of natural gas and crude oil production and has limited uses. We estimate U.S. ethane production capacity currently exceeds U.S. demand by 300 MBPD and could exceed demand by up to 700 MBPD by 2020, after considering the estimated incremental demand from new ethylene facilities that have been announced. By providing new markets access to ethane, we are assisting U.S. producers to increase their production, which assures the U.S. will have access to abundant supplies of domestically produced natural gas and crude oil,” stated Creel.</p> <p>The ethane export facility will be integrated with Enterprise’s <a href="http://abarrelfull.wikidot.com/mont-belvieu-gas-processing-plants">Mont Belvieu complex</a>, which includes over 650 MBPD of natural gas liquid (“NGL”) fractionation capacity and 100 million barrels of NGL storage capacity. The partnership’s Mont Belvieu facility receives NGL supplies from the major producing basins across the U.S. The Mont Belvieu complex is connected to growing supplies of ethane from the Marcellus and Utica shale regions through Enterprise’s recently completed <a href="http://abarrelfull.wikidot.com/appalachia-to-texas-ethane-pipeline">ATEX ethane pipeline</a>. Enterprise’s integrated NGL system will offer supply assurance and diversification for the export facility.</p> <ul> <li><a href="http://phx.corporate-ir.net/phoenix.zhtml?c=80547&amp;p=irol-newsArticle&amp;ID=1920835&amp;highlight=">Enterprise Products to Build Ethane Export Facility on Texas Gulf Coast</a></li> </ul> <p>by <span class="printuser avatarhover"><a href="http://www.wikidot.com/user:info/abarrelfull" ><img class="small" src="http://www.wikidot.com/avatar.php?userid=418097&amp;amp;size=small&amp;amp;timestamp=1787129926" alt="abarrelfull" style="background-image:url(http://www.wikidot.com/userkarma.php?u=418097)" /></a><a href="http://www.wikidot.com/user:info/abarrelfull" >abarrelfull</a></span></p> 
				 	]]>
				</content:encoded>							</item>
					<item>
				<guid>http://killajoules.wikidot.com/blog:4879</guid>
				<title>Enterprise to Expand LPG Export Facility at Oiltanking on Houston Ship Channel</title>
				<link>http://killajoules.wikidot.com/blog:4879</link>
				<description>

&lt;p&gt;Enterprise Products Partners L.P. (NYSE: EPD) today announced a further expansion of its liquefied petroleum gas (“LPG”) export terminal at &lt;a href=&quot;http://abarrelfull.wikidot.com/houston-ship-channel-oil-terminal-complex&quot;&gt;Oiltanking’s complex on the Houston Ship Channel&lt;/a&gt;. Enterprise’s expanded LPG terminal is supported by a 50-year service agreement with Oiltanking Partners, L.P. (NYSE: OILT) to provide additional dock space and related services. The expanded LPG export terminal is expected to be in service by the end of 2015 and is supported by long-term LPG export agreements. Upon completion of the expanded facilities, Enterprise will have aggregate capacity to load in excess of 16 million barrels per month of low-ethane propane and/or butane. This expansion is in lieu of a second LPG terminal announced in October 2013 and will result in more capacity than previously anticipated.&lt;/p&gt;
&lt;p&gt;by &lt;span class=&quot;printuser avatarhover&quot;&gt;&lt;a href=&quot;http://www.wikidot.com/user:info/abarrelfull&quot;  &gt;&lt;img class=&quot;small&quot; src=&quot;http://www.wikidot.com/avatar.php?userid=418097&amp;amp;amp;size=small&amp;amp;amp;timestamp=1787129926&quot; alt=&quot;abarrelfull&quot; style=&quot;background-image:url(http://www.wikidot.com/userkarma.php?u=418097)&quot; /&gt;&lt;/a&gt;&lt;a href=&quot;http://www.wikidot.com/user:info/abarrelfull&quot;  &gt;abarrelfull&lt;/a&gt;&lt;/span&gt;&lt;/p&gt;
</description>
				<pubDate>Sat, 11 Jan 2014 16:29:04 +0000</pubDate>
												<content:encoded>
					<![CDATA[
						 <p>Enterprise Products Partners L.P. (NYSE: EPD) today announced a further expansion of its liquefied petroleum gas (“LPG”) export terminal at <a href="http://abarrelfull.wikidot.com/houston-ship-channel-oil-terminal-complex">Oiltanking’s complex on the Houston Ship Channel</a>. Enterprise’s expanded LPG terminal is supported by a 50-year service agreement with Oiltanking Partners, L.P. (NYSE: OILT) to provide additional dock space and related services. The expanded LPG export terminal is expected to be in service by the end of 2015 and is supported by long-term LPG export agreements. Upon completion of the expanded facilities, Enterprise will have aggregate capacity to load in excess of 16 million barrels per month of low-ethane propane and/or butane. This expansion is in lieu of a second LPG terminal announced in October 2013 and will result in more capacity than previously anticipated.</p> <p>“We are pleased to announce the expansion of our LPG export marine terminal and the associated 50-year agreement with Oiltanking,” said Michael A. Creel, chief executive officer of Enterprise’s general partner. “The decision to expand at Oiltanking was directly attributable to our joint experience of loading LPG vessels on the Houston Ship Channel and our 33-year relationship with Oiltanking. Demand for both current and future LPG exports continues to be strong. The location of the expanded terminal at Oiltanking enables us to increase maximum loading capacity to approximately 27,000 barrels per hour, the highest in the industry, while nominally reducing the overall capital costs associated with the project.”</p> <p>“On the ethane front, we continue to negotiate with several customers that would support the development of an ethane export terminal. Our site evaluation for this facility continues. Depending on the outcome of these discussions, estimated ethane export demand and ship draft requirements, we expect the ethane export facility will be sited either adjacent to our refined products export terminal in Beaumont or on the Houston Ship Channel.”</p> <ul> <li><a href="http://phx.corporate-ir.net/phoenix.zhtml?c=80547&amp;p=irol-newsArticle&amp;ID=1888489&amp;highlight=">Enterprise to Expand LPG Export Facility at Oiltanking on Houston Ship Channel</a></li> </ul> <div style="clear:both; height: 0px; font-size: 1px"></div> <hr /> <table style="margin: 0 10px;"> <tr style="vertical-align:top; align:center"> <td style="padding: 10px; width: 100%;"> <p><strong>Related News</strong></p> <p><strong>Looking for information on the Pipeline sector?</strong></p> <ul> <li><a href="http://abarrelfull.wikidot.com/oil-and-gas-pipelines">Oil and Gas Pipelines</a></li> <li><a href="http://abarrelfull.wikidot.com/construction-and-engineering-companies-pipeline-references">Construction And Engineering Companies Pipeline References</a></li> </ul> </td> <td style="padding: 10px; width: 100%;"> <p><iframe src="https://www.flickr.com/photos/royaldutchshell/5135764786/in/set-72157625287640424/player/" width="240" height="160" frameborder="0" allowfullscreen="allowfullscreen" webkitallowfullscreen="" mozallowfullscreen="" oallowfullscreen="" msallowfullscreen=""></iframe></p> </td> </tr> </table> <p>by <span class="printuser avatarhover"><a href="http://www.wikidot.com/user:info/abarrelfull" ><img class="small" src="http://www.wikidot.com/avatar.php?userid=418097&amp;amp;size=small&amp;amp;timestamp=1787129926" alt="abarrelfull" style="background-image:url(http://www.wikidot.com/userkarma.php?u=418097)" /></a><a href="http://www.wikidot.com/user:info/abarrelfull" >abarrelfull</a></span></p> 
				 	]]>
				</content:encoded>							</item>
					<item>
				<guid>http://killajoules.wikidot.com/blog:4786</guid>
				<title>Enterprise Products Begins Line-Filling ATEX Express Pipeline</title>
				<link>http://killajoules.wikidot.com/blog:4786</link>
				<description>

&lt;p&gt;Enterprise Products Partners L.P. (NYSE: EPD) today announced that the process of injecting ethane into the &lt;a href=&quot;http://abarrelfull.wikidot.com/appalachia-to-texas-ethane-pipeline&quot;&gt;Appalachia-to-Texas Express (“ATEX”) pipeline&lt;/a&gt; began in late November and will continue throughout December 2013. Commercial service is expected to begin in January 2014.&lt;/p&gt;
&lt;p&gt;by &lt;span class=&quot;printuser avatarhover&quot;&gt;&lt;a href=&quot;http://www.wikidot.com/user:info/abarrelfull&quot;  &gt;&lt;img class=&quot;small&quot; src=&quot;http://www.wikidot.com/avatar.php?userid=418097&amp;amp;amp;size=small&amp;amp;amp;timestamp=1787129926&quot; alt=&quot;abarrelfull&quot; style=&quot;background-image:url(http://www.wikidot.com/userkarma.php?u=418097)&quot; /&gt;&lt;/a&gt;&lt;a href=&quot;http://www.wikidot.com/user:info/abarrelfull&quot;  &gt;abarrelfull&lt;/a&gt;&lt;/span&gt;&lt;/p&gt;
</description>
				<pubDate>Sun, 08 Dec 2013 19:27:07 +0000</pubDate>
												<content:encoded>
					<![CDATA[
						 <p>Enterprise Products Partners L.P. (NYSE: EPD) today announced that the process of injecting ethane into the <a href="http://abarrelfull.wikidot.com/appalachia-to-texas-ethane-pipeline">Appalachia-to-Texas Express (“ATEX”) pipeline</a> began in late November and will continue throughout December 2013. Commercial service is expected to begin in January 2014.</p> <p>The 1,230-mile ATEX pipeline originates in Washington County, Pennsylvania and is, or will be, connected to four fractionators in the Marcellus/Utica Shale region. These plants include the MarkWest Houston plant in Pennsylvania and Cadiz plant in Ohio, the Blue Racer Natrium plant in West Virginia and the Utica East Ohio Scio plant in Ohio. ATEX will have an initial capacity of 125,000 barrels per day (“BPD”), expandable to at least 265,000 BPD. The project is supported by firm, ship-or-pay transportation agreements with 15-year terms. Approximately 65,000 BPD of those contracted volumes are expected to be transported initially, ramping up to more than 130,000 BPD beginning in 2018.</p> <p>ATEX terminates at Enterprise’s Mont Belvieu, Texas complex which includes over 100 million barrels of natural gas liquid (“NGL”) and petroleum liquid storage capacity, more than 750,000 BPD of fractionation capacity and an extensive NGL distribution system. With the addition of its Aegis ethane pipeline now under construction, Enterprise will link Marcellus-produced ethane to every existing ethylene production facility in the U.S. and provide supply security to support construction of new crackers currently planned for the Gulf Coast. In addition, Enterprise’s distribution system supplies the partnership’s LPG export terminal on the Houston Ship Channel and a second export terminal that is under development, which could ultimately provide U.S.-produced ethane to international markets.</p> <p>“The ATEX project provides producers in the rapidly growing Marcellus/Utica region with the critical ethane takeaway capacity that is needed now to allow them to continue developing their reserves, as well as gain access to the largest NGL market in the U.S.,” said A.J. “Jim” Teague, chief operating officer of Enterprise’s general partner. “With its expandability and eventual accessibility to our ethane header system, ATEX will supply petrochemical operators from Corpus Christi, Texas to the Mississippi River corridor in Louisiana with reliable sources of NGL feedstock, which continues to be cost advantaged compared to crude oil-based derivatives.”</p> <ul> <li><a href="http://phx.corporate-ir.net/phoenix.zhtml?c=80547&amp;p=irol-newsArticle&amp;ID=1882341&amp;highlight=">Enterprise Products Begins Line-Filling ATEX Express Pipeline</a></li> </ul> <p>by <span class="printuser avatarhover"><a href="http://www.wikidot.com/user:info/abarrelfull" ><img class="small" src="http://www.wikidot.com/avatar.php?userid=418097&amp;amp;size=small&amp;amp;timestamp=1787129926" alt="abarrelfull" style="background-image:url(http://www.wikidot.com/userkarma.php?u=418097)" /></a><a href="http://www.wikidot.com/user:info/abarrelfull" >abarrelfull</a></span></p> 
				 	]]>
				</content:encoded>							</item>
					<item>
				<guid>http://killajoules.wikidot.com/blog:4623</guid>
				<title>Enterprise to Increase Capacity on Aegis Ethane Pipeline; Conducts Supplemental Open Season</title>
				<link>http://killajoules.wikidot.com/blog:4623</link>
				<description>

&lt;p&gt;Enterprise Products Partners L.P. (NYSE:EPD) today announced an expansion of its wholly owned &lt;a href=&quot;http://abarrelfull.wikidot.com/enterprise-aegis-ethane-pipeline&quot;&gt;Aegis Pipeline&lt;/a&gt; following strong interest from shippers. Long-term agreements have been executed, which support increasing the size of the Aegis pipeline to 20-inches in diameter, which will facilitate delivery of up to 425,000 barrels per day of ethane to the expanding petrochemical corridor along the Gulf Coast.&lt;/p&gt;
&lt;p&gt;by &lt;span class=&quot;printuser avatarhover&quot;&gt;&lt;a href=&quot;http://www.wikidot.com/user:info/abarrelfull&quot;  &gt;&lt;img class=&quot;small&quot; src=&quot;http://www.wikidot.com/avatar.php?userid=418097&amp;amp;amp;size=small&amp;amp;amp;timestamp=1787129926&quot; alt=&quot;abarrelfull&quot; style=&quot;background-image:url(http://www.wikidot.com/userkarma.php?u=418097)&quot; /&gt;&lt;/a&gt;&lt;a href=&quot;http://www.wikidot.com/user:info/abarrelfull&quot;  &gt;abarrelfull&lt;/a&gt;&lt;/span&gt;&lt;/p&gt;
</description>
				<pubDate>Tue, 15 Oct 2013 18:35:07 +0000</pubDate>
												<content:encoded>
					<![CDATA[
						 <p>Enterprise Products Partners L.P. (NYSE:EPD) today announced an expansion of its wholly owned <a href="http://abarrelfull.wikidot.com/enterprise-aegis-ethane-pipeline">Aegis Pipeline</a> following strong interest from shippers. Long-term agreements have been executed, which support increasing the size of the Aegis pipeline to 20-inches in diameter, which will facilitate delivery of up to 425,000 barrels per day of ethane to the expanding petrochemical corridor along the Gulf Coast.</p> <p>The 270-mile Aegis pipeline will originate at Enterprise’s Mont Belvieu, Texas liquids storage complex and, through connections to other Enterprise-owned pipelines, will deliver purity ethane to ethylene production facilities between Beaumont, Texas and Napoleonville, Louisiana. Aegis will commence service in phases, with initial deliveries expected to begin during the second quarter of 2014.</p> <p>“Interest continues to build as shippers recognize the value Aegis offers through enhanced flexibility, supply diversification and market access,” said A.J. “Jim” Teague, chief operating officer of Enterprise’s general partner. “As an extension of our midstream network that features access to 100 million barrels of storage capacity at our Mont Belvieu complex, the Aegis pipeline system offers a complete and integrated solution for meeting the needs of both producers and consumers of growing domestic supplies of ethane. Together, Aegis and our South Texas ethane pipeline enable Enterprise to provide ethylene facilities from Corpus Christi to the Mississippi River with reliable supplies of ethane through a header system anchored by our Mont Belvieu complex.”</p> <ul> <li><a href="http://phx.corporate-ir.net/phoenix.zhtml?c=80547&amp;p=irol-newsArticle&amp;ID=1864090&amp;highlight=">Enterprise to Increase Capacity on Aegis Ethane Pipeline; Conducts Supplemental Open Season</a></li> </ul> <p>by <span class="printuser avatarhover"><a href="http://www.wikidot.com/user:info/abarrelfull" ><img class="small" src="http://www.wikidot.com/avatar.php?userid=418097&amp;amp;size=small&amp;amp;timestamp=1787129926" alt="abarrelfull" style="background-image:url(http://www.wikidot.com/userkarma.php?u=418097)" /></a><a href="http://www.wikidot.com/user:info/abarrelfull" >abarrelfull</a></span></p> 
				 	]]>
				</content:encoded>							</item>
					<item>
				<guid>http://killajoules.wikidot.com/blog:4559</guid>
				<title>Plains All American and Enterprise Products Announce Agreement to Expand Eagle Ford Joint Venture Pipeline</title>
				<link>http://killajoules.wikidot.com/blog:4559</link>
				<description>

&lt;p&gt;Plains All American Pipeline, L.P. (NYSE: PAA) and Enterprise Products Partners L.P. (NYSE: EPD) today announced they have agreed to expand their &lt;a href=&quot;http://abarrelfull.wikidot.com/eagle-ford-jv-pipeline-system&quot;&gt;Eagle Ford Joint Venture (JV) crude oil pipeline&lt;/a&gt;. The expansion will increase the pipeline’s capacity to 470,000 barrels per day of light and medium crude oil grades to accommodate additional volumes expected from PAA’s &lt;a href=&quot;http://abarrelfull.wikidot.com/cactus-oil-pipeline&quot;&gt;Cactus pipeline&lt;/a&gt; that is currently under construction. The Eagle Ford JV pipeline expansion is expected to cost approximately $120 million and is expected to be in service in the second quarter of 2015.&lt;/p&gt;
&lt;p&gt;by &lt;span class=&quot;printuser avatarhover&quot;&gt;&lt;a href=&quot;http://www.wikidot.com/user:info/abarrelfull&quot;  &gt;&lt;img class=&quot;small&quot; src=&quot;http://www.wikidot.com/avatar.php?userid=418097&amp;amp;amp;size=small&amp;amp;amp;timestamp=1787129926&quot; alt=&quot;abarrelfull&quot; style=&quot;background-image:url(http://www.wikidot.com/userkarma.php?u=418097)&quot; /&gt;&lt;/a&gt;&lt;a href=&quot;http://www.wikidot.com/user:info/abarrelfull&quot;  &gt;abarrelfull&lt;/a&gt;&lt;/span&gt;&lt;/p&gt;
</description>
				<pubDate>Fri, 20 Sep 2013 06:36:47 +0000</pubDate>
												<content:encoded>
					<![CDATA[
						 <p>Plains All American Pipeline, L.P. (NYSE: PAA) and Enterprise Products Partners L.P. (NYSE: EPD) today announced they have agreed to expand their <a href="http://abarrelfull.wikidot.com/eagle-ford-jv-pipeline-system">Eagle Ford Joint Venture (JV) crude oil pipeline</a>. The expansion will increase the pipeline’s capacity to 470,000 barrels per day of light and medium crude oil grades to accommodate additional volumes expected from PAA’s <a href="http://abarrelfull.wikidot.com/cactus-oil-pipeline">Cactus pipeline</a> that is currently under construction. The Eagle Ford JV pipeline expansion is expected to cost approximately $120 million and is expected to be in service in the second quarter of 2015.</p> <p>The Eagle Ford JV Pipeline system, most of which is currently in service and expected to be completed by September 30, 2013, is a 50/50 joint venture between Plains and Enterprise that serves the Three Rivers and Corpus Christi refineries and other markets via marine transport facilities at Corpus Christi. The pipeline supplies the Houston-area market through a connection to the Enterprise Crude Pipeline terminal at Lyssy in Wilson County, Texas. The pipeline expansion will be completed in stages that include adding pumping capacity and looping certain segments of the existing system. The expansion also includes constructing an additional 2.3 million barrels of operational storage capacity in Gardendale, Tilden and Corpus Christi.</p> <p>The Cactus Pipeline is being constructed by PAA from McCamey, Texas in the Permian Basin area to Gardendale in La Salle County, Texas. The pipeline will have an initial capacity of 200,000 barrels per day and is expected to be in service in the second quarter of 2015.</p> <ul> <li><a href="http://phx.corporate-ir.net/phoenix.zhtml?c=80547&amp;p=irol-newsArticle&amp;ID=1856422&amp;highlight=">Plains All American and Enterprise Products Announce Agreement to Expand Eagle Ford Joint Venture Pipeline</a></li> </ul> <div style="clear:both; height: 0px; font-size: 1px"></div> <hr /> <table style="margin: 0 10px;"> <tr style="vertical-align:top; align:center"> <td style="padding: 10px; width: 100%;"> <p><strong>Related News</strong></p> <p><strong>Looking for information on the Pipeline sector?</strong></p> <ul> <li><a href="http://abarrelfull.wikidot.com/oil-and-gas-pipelines">Oil and Gas Pipelines</a></li> <li><a href="http://abarrelfull.wikidot.com/construction-and-engineering-companies-pipeline-references">Construction And Engineering Companies Pipeline References</a></li> </ul> </td> <td style="padding: 10px; width: 100%;"> <p><iframe src="https://www.flickr.com/photos/royaldutchshell/5135764786/in/set-72157625287640424/player/" width="240" height="160" frameborder="0" allowfullscreen="allowfullscreen" webkitallowfullscreen="" mozallowfullscreen="" oallowfullscreen="" msallowfullscreen=""></iframe></p> </td> </tr> </table> <p>by <span class="printuser avatarhover"><a href="http://www.wikidot.com/user:info/abarrelfull" ><img class="small" src="http://www.wikidot.com/avatar.php?userid=418097&amp;amp;size=small&amp;amp;timestamp=1787129926" alt="abarrelfull" style="background-image:url(http://www.wikidot.com/userkarma.php?u=418097)" /></a><a href="http://www.wikidot.com/user:info/abarrelfull" >abarrelfull</a></span></p> 
				 	]]>
				</content:encoded>							</item>
				</channel>
</rss>